Laserfiche WebLink
L GROUNDWATER MONITORING WELL PURGEISAMPLING WORK SHEET <br /> Protect Name MoiTEC� <br /> Address r Project Number q??T5 - 75-61 <br /> Date -Z 3-01 <br /> Well Number &K-$ Well Lock Number <br /> Develo Well Integnty <br /> pmentlPurge/Sampler(s) Ambient Conditions A,r.r <br /> Pre-Purge DO (mg/L) <br /> Screened at_^� WELL VOLUME CALCULATION <br /> ' Well Casing Total Well Depth to Linear Feet Gallons Per <br /> Diameter in De th It Goundwater G of GW Linear Foat <br /> 2 X 017 1 Well Volume at <br /> 3 3s - 'S z5 - ZZ.�S X 038 = IS;al' <br /> - X 066 <br /> 6 - _ X 083 = <br /> X 45 _ <br /> GROUNDWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product (ft} (n } `l`L Sheen/Iridescence c, Odor IQ 0, <br /> GROUNDWATER PURGING PURGE METHOD <br /> ' ❑ Stainless Steel Bailer <br /> „Submersible Pump, ❑Air Diaphragm Pump, ❑Honda Pump, ❑Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. ColorrTurbidity , <br /> Purged (gal.) Time pH (pslumhos) (aq (other) <br /> 0 0 10 -5- 7-2,5 <br /> Recovery <br /> 2 136- ILIO 1 r, Rate <br /> 3 — - aS -74:) <br /> to Fast <br /> 4 _ ;o� (� ? t5 " Medium <br /> 5 <br /> 6 _ Slaw <br /> 7 <br /> 8 <br /> 10 <br /> GROUNDWATER SAMPLING Sampling Equipment <br /> Water Level Recovery Sample Containers <br /> Depth to; (ft) No Preservation Method/pH <br /> (I) Initially - �5 2 <br /> {P) After Purging 1 lS 1 liter(z), amber glass <br /> P - 0 8 P f) - 40 ml VOA � _ C Z <br /> ( _ f�� 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling 15 M Trip Blank <br /> (P-S)/ (P-I)X 100 <br /> = %Total Recovery <br /> Sample Date/Time _1-23- ( I -1—S Turbidity (NTU) :�>. T <br /> Q <br /> Calibrate Date/Time —L ZS-Dj 090D EHM �e2-- <br /> PURGED WATER CONTAINMENT ( EV) <br /> ' Total drums at site Water I DiQ411"n Soii Water pump through treatment system <br /> �emarks <br /> E 1A111,1 NlEN'%TROTRGW Su PbPg PurpZ do 'I <br />