Laserfiche WebLink
r <br /> GROUNDWATER MONITORING WELL PURGEISAMPLING WORK SHEET <br /> Project Name AAtr#,L-- _„ _ Project Number 173---75-03 <br /> Address Well Lock Number <br /> Well Number .-r-KL4 <br /> Development/Purge/Sampler(s) <br /> Greened at WELL VOLUME CALCULATION <br /> Veli Casing Total Well Depth to Linear Feet Gallons Per <br /> Diameter in Depth ft} Goundwater (GW) of GW Linear Foot 1 Well Volume (Sal} <br /> 2 — - X 01� - <br /> 3 3 _ 1 �'�Q = Iy,O X 038 <br /> ' 4 _ Y X oss <br /> 45 X 083 = <br /> & - X 15 - <br /> GROUNDWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product (ft ) (in ) JQ!:::: Sheen/iridescence H0*Z Odor <br /> GROUNDWATER PURGING PURGE METHOD <br /> ❑ Stainless Steel Bailer, Submersible Pump, ❑ Air Diaphragm Pump, ❑ Other <br /> Stagnant Volume Recovery <br /> Volumes Purged Conductivity Temp Color/Turbidity <br /> Purged (gal ) Time pH E.s/umhos of °C (other) Depth Time <br /> 1 -- Le _ Z:3 Y 7, od 2.J 6e <br /> 2 - - -�2= _� - rr <br /> ' 4 _ - 2 �q <br /> 6 <br /> 1 8 <br /> 9 <br /> 10 <br /> GROUNDWATER SAMPLING <br /> _Water Level Recovery Sample Containers <br /> Depth to GW (ft ) No Preservation Method/pH <br /> (1) Initially /P-3 4-76 1 liter (e) amber glass <br /> (P) After Purging 22-01:1 40 mt, VOA <br /> P - 0 8 (P-1) = 80% Recovery 500 me polypropylene <br /> (S) Before Sampling Trip Blank <br /> (P-S) / (P-1) X 100 = % Total Recovery <br /> ' Sample Date/Time �Z��a �f Turbidity (NTU) 1�-d <br /> DO (mg/L) al-- -- <br /> EH (MEV) _In <br /> PURGED WATER CONTAINMENT <br /> Total drums at site Water Soil Water pump through treatment system <br /> Remarks <br /> _. _ _ OST <br />