Laserfiche WebLink
' GROUNDWATER MONITORING WELL PURGE/SAMPLING WORK SHEET <br /> Project Name _tea,..r a L. - Project Number 99171--X-y/ _ <br /> Address. Well Loch Number <br /> Well Number Mw- <br /> Development/Purge/Sampler(s) <br /> Greened at WELL VOLUME CALCULATION <br /> All Casing Total Wel[ depth to Linear Feet Gallons Per <br /> Diameter(in) 0e th ft Goun_dwater (GW) of GW Linear Foot i Well Volume foal) <br /> 3 .. 30 — r �� Z3 �S� X 038 _ lV• qd <br /> 1 4 Y _ x 066 <br /> 4 = <br /> 5 X 083 <br /> 5 — X 15 <br /> rGROUNDWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product (ft ) (in ) _ Sheen/iridescence Odor Mwu, <br /> ' GROUNDWATER PURGING PURGE METHOD <br /> ❑ Stainless Steel Bailer, Submersible Pump, ❑ Air Diaphragm Pump, ❑ Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp ColorlTurbldity Recovery <br /> Purged (gal ) Time pH Eslumhos of"C (other) Depth Tim <br /> 1 f0- [ -1 &70 ze rr <br /> z qJ_0 _l r,T?7 e4 Leo ze Ir - <br /> 3 31 -t' -14L 41-'-), _- zo (r <br /> ' 5 <br /> 6 <br /> ' 8 . <br /> 9 <br /> 10 <br /> GROUNDWATER SAMPLING <br /> ' Water Level Recovery Sample Containers <br /> Depth to GW(ft ) No Preservation Method/pH <br /> (1) Initially -rgf 1-3 1 liter (f), amber glass <br /> (P) After Purging IS--QQ 40 mf, VOA G 2f& t- <br /> ' P - 0 8 (P-1) = 80% Recovery 500 mf polypropylene <br /> (S) Before Sampling tZ3 Trip Blank <br /> (P-S) / (P-1) X 100 = X00 % Total Recovery <br /> ' Sample Date/Time JQ Ito IV Turbidity (NTU) CJ � <br /> DO (mg/L) <br /> EH (MEV) 3 <br /> ' PURGED WATER CONTAINMENT <br /> Total drums at site Water Soil Water pump through treatment system <br /> Remarks <br /> ' - _- OST - <br />