Laserfiche WebLink
1 ti GROUNDWATER MONITORING WELL PURGE/SAMPLING WORK SHEET <br /> Project Name A-aw Project Number S-7 -7roI <br /> Address Well Lock Number <br /> ' Well Number Q911 W <br /> DevelopmenUPurge ampler(s) <br /> Greened at WELL VOLUME CALCULATION <br /> V4611 Casing Total Well Depth to t.inear Feet Gallons Per <br /> Diameter (in) De th ft Goundwater (G3M of GW Linear Foot 1 Well Volume (gal) <br /> 2 <br /> X 017 <br /> 45 — = X 083 <br /> 6 — X 15 <br /> ' GROUNDWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product (ft ) (in ) ___ y _ Sheenllridescence Odor HOMJ�. <br /> GROUNDWATER PURGING PURGE METHOD <br /> ❑ Stainless Steel Bailer, L9'Submersible Pump, ❑ Air Diaphragm Pump, ❑ Other <br /> Stagnant Vofume Recovery <br /> Volumes Purged Conductivity Temp ColorlTurbidity <br /> Purged (gal ) Time pH pslumhos of OC (other) Depth Tim <br /> 0 0 t1-4( "7rb () i_ 13 <br /> 1 / 6 z Tto <br /> 4 I. <br /> s <br /> 6 <br /> 1 8 <br /> 9 <br /> ' 10 <br /> GROUNDWATER SAMPLING <br /> Water Level Recovery Sample Containers <br /> Depth to GW (ft ) No Preservation Method/pH <br /> (1) Initially 1 liter (P), amber glass <br /> (P) After Purging -6:36 40 me, VOA <br /> ' P - 0 8 (P-1) = 80% Recovery 500 me, polypropylene <br /> (S) Before Sampling Trip Blank <br /> (P-S) / (P-1) X 100 40 % Total Recovery <br /> Sample Date/Time &I r(J 9c,,i zo Turbidity (NTU) �G <br /> DO (mg/L) LJ.Q <br /> EH (MEV) 3 <br /> PURGED WATER CONTAINMENT <br /> Total drums at site Water Soil Water pump through treatment system <br /> Remarks <br /> — __._...._� ... . 0ST <br />