My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
17287
>
2900 - Site Mitigation Program
>
PR0523938
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 2:44:52 PM
Creation date
3/10/2020 10:39:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523938
PE
2965
FACILITY_ID
FA0016108
FACILITY_NAME
TCN PROPERTIES
STREET_NUMBER
17287
Direction
S
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
24102051
CURRENT_STATUS
01
SITE_LOCATION
17287 S MANTHEY RD
P_LOCATION
07
P_DISTRICT
000
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Central Valley Regional Water Quality Control Board 6375.4.002.01 <br /> Yosemite Avenue Properties December 6, 2004 <br /> WORK PLAN FOR GROUNDWATER STUDIES Page 4 <br /> • The general minerals suite include filtered analysis of ammonia as N, bicarbonate alkalinity, <br /> bromide, carbonate alkalinity, chlorine, fluoride, hardness, methylene blue activated substances <br /> (MBAS), nitrates + nitrite as N, pH, phosphate, sulfate, sulfite, total alkalinity, total dissolved <br /> solids (TDS), total Kjedahl nitrogen (TKN), total nitrogen , total/fecal Coli form organisms, and <br /> trihalomethanes including chloroform, bromodichloromethane, dibromochloromethane, and <br /> bromoform. <br /> • The metals suite includes filtered and unfiltered metals analyses of aluminum, barium, boron, <br /> calcium,iron, chromium,copper,lead, manganese,potassium, sodium, and zinc. <br /> Reports <br /> We will prepare an installation summary report and quarterly groundwater sampling reports that <br /> include water quality sampling results presented in data tables, a well location map, and a sketch <br /> map describing water level data for each quarter. Quarterly reports will include quarterly and <br /> cumulative data of all sampling parameters and interpretation of analytical data. Discussion and <br /> analysis will be focus on baseline data compared to potential effects of the wastewater <br /> sprayfield. Each of the quarterly reports will include a groundwater plot for each well's data and <br /> figures to illustrate the groundwater flow direction and gradient calculated using selected water <br /> level data. <br /> SCHEDULE <br /> We plan to complete the monitoring well installation within approximately 4 weeks of receiving <br /> formal approval of this work plan. Reporting and continued monitoring efforts for the <br /> groundwater study are will be performed over the next year. <br /> If you have any questions on any portion of this work plan, please call and we will be glad to <br /> discuss them with you. <br /> Very truly yours, <br /> ENGE INCORPORATED Reviewed by: — <br /> Ay e Jensen, CEG Dennis B. Nakamoto <br /> cls/dbn/tw:workplan <br /> Attachments: Figure 1 –Site Plan <br /> Figure 2–Proposed Well Locations <br /> cc: 1 - Mr. John Scherer, TCN Properties,L.P. <br />
The URL can be used to link to this page
Your browser does not support the video tag.