Laserfiche WebLink
r n <br /> Chevron Products Company 3 <br /> Chevron Station#9 1452 34 Fast Main Street Ripon,California A nl 24 2001 <br /> SITE ASSESSMENT REPORT <br /> • <br /> A site assessment report will be issued following the completion of all field activities <br /> and the receipt of analytical reports from the laboratory The report will provide a <br /> request for no further action in accordance with the October 1996 Appendix B <br /> guidelines A letter work plan for removal of the site wells will accompany the report <br /> Following review from the SJPHS and the RWQCB of the analytical results, Chevron <br /> and SECOR anticipate approval to destroy the existing site wells <br /> WELL DESTRUCTION <br /> Following approval, wells MW-1,MW-2, and MW-3 will be destroyed by pressure <br /> grouting the wells from the bottom up and then drilling out the top five feet The well <br /> boxes will be removed and the bonngs will be finished to grade with cement <br /> WELL DESTRUCTION REPORT <br /> A report documenting the destruction of the site wells will be issued following the <br /> completion of field activities <br /> SCHEDULE <br /> Figure 3 —Project Schedule provides a graphic schedule of the work described above <br /> This schedule includes review and comment by the SJPHS and estimated duration for <br /> permitting required with the SJPHS and the City of Ripon <br /> If there are any questions regarding the contents of this work plan, please call us at <br /> (916) 861-0400 <br /> SINCERELY, <br /> SECOR INTERNATIONAL INCORPORATED <br /> 61)al� <br /> Brian Silva <br /> Staff Scientist <br /> Cott Gable, R. . <br /> Senior Geologist <br /> 11Chevron191452WEP0RTSVurther site assessment WP_RevA doc <br />