Laserfiche WebLink
k <br /> S E C 0 R <br /> Ms Victoria McCartney <br /> January 05, 2004 <br /> • Page 2 <br /> Enclosures <br /> Table 1 Extracted Groundwater Analytical Data <br /> Table 2 Extracted Groundwater MtBE Mass Removal <br /> s <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Attachment 1 County Correspondence <br /> Attachment 2 Extracted Groundwater Analytical Report and Chain-of-Custody Documents r <br /> Attachment 3 Batch Extraction Field Data Sheets <br /> cc Mr Robert J Cochran, Chevron Environmental Management Company, San Ramon, CA <br /> Mr Jim Barton, Regional Water Quality Control Board, Sacramento, CA <br /> r <br /> +�}r <br /> �r <br /> x� <br /> f <br /> r� <br /> tl� <br /> A� <br /> I F: <br /> t <br /> f <br /> Zrv*S" <br /> Al <br /> f <br /> 3 <br /> 3g <br /> La <br /> x <br /> Y, <br /> r, <br /> i <br /> 4 <br /> 11Chevron1914521REPORTS1Batch ExtractionlDecember 2003 Batch Extraction doc a <br /> a <br /> ye <br />