Laserfiche WebLink
E C 0 R <br /> Ms Victoria McCartney <br /> December 11, 2003 <br /> . Page ,l <br /> Enclosures <br /> Table 1 Extracted Groundwater Analytical Data <br /> Table 2 Extracted Groundwater MtBE Mass Removal <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Attachment i County Correspondence <br /> Attachment 2 Extracted Groundwater Analytical Report and Chain-of-Custody Documents <br /> Attachment 3 Batch Extraction Field Data Sheets ` <br /> cc Mr Robert J Cochran, Chevron Environmental Management Company, San Ramon, CA ° <br /> Mr Jim Barton, Regional Water Quality Control Board, Sacramento, CA <br /> f� <br /> r� <br /> Ki <br /> a <br /> ,p <br /> ' <br /> f <br /> xi <br /> oaf <br /> 9 <br /> K�I <br /> a <br /> NY <br /> /A <br /> t <br /> {L fj <br /> r�t <br /> r, <br /> t <br /> 'a <br /> V <br /> M <br /> I Zhevron1914521REPORTS1Batch Extraction\Batch Extraction November 2003 doc <br /> as <br /> a <br />