My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
2224
>
3500 - Local Oversight Program
>
PR0545512
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 5:10:41 AM
Creation date
3/10/2020 1:37:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545512
PE
3526
FACILITY_ID
FA0003679
FACILITY_NAME
CALIFORNIA STOP*
STREET_NUMBER
2224
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16313007
CURRENT_STATUS
02
SITE_LOCATION
2224 MANTHEY RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dung T. Phan And Nhuan Le -2- 10/27/09 <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Task* Amount Pre- Comments <br /> Approved <br /> 1 Planning / Coordination $1,960 no changes to proposal. <br /> 2 Groundwater Batch Removal $35,220 no changes to proposal. <br /> 3 Report Preparation $3,335 no changes to proposal. <br /> TOTAL PRE-APPROVED $ 40,515 <br /> * Task descriptions are the same as those identified in Advanced GeoEnvironmental, <br /> Inc.'s September 14, 2009 cost estimate. <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The <br /> Fund will review any tasks/costs that go beyond the pre-approved amount to be <br /> determined if the additional tasks and costs are necessary and reasonable. <br /> However, if costs exceed the above pre-approved amounts, the Fund will be unable <br /> to expedite your Reimbursement Request. <br /> • The work products must be acceptable to the County and the Regional Water <br /> Quality Control Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval <br /> of costs on the new scope of work. <br /> • Although I have referred to the Advanced GeoEnvironmental, Inc. proposal in my <br /> pre-approval above, please be aware that you will be entering into a private contract: <br /> the State of California cannot compel you to sign any specific contract. This letter <br /> pre-approves the costs as presented in the proposal dated September 14, 2009, <br /> by Advanced GeoEnvironmental, Inc. for conducting the work approved by the <br /> County for implementing the July 25, 2008, Advanced GeoEnvironmental, Inc. work <br /> plan. <br /> I also want to remind you that the Fund's regulations require that you obtain at least <br /> three bids, or a bid waiver from Fund staff, from qualified firms for all necessary future <br /> corrective action work. If you need assistance in procuring contractor and consultant <br /> services, don't hesitate to call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as <br /> explained in the Reimbursement Request Instructions to confirm that the costs are <br /> consistent with this pre-approval before you will be reimbursed. Please insure that <br /> your consultant prepares their invoices to include the required breakdown of <br /> costs on a time and materials basis, that invoiced tasks are consistent with the <br /> original proposal, and that reasonable explanations are provided for any changes <br /> California Environmental Protection Agenel <br /> 0 Recj cled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.