Laserfiche WebLink
Site Background Information: California Stop <br /> Page 4of7 <br /> ranging from 0.28 mg/kg to 3.0 mg/kg. TAME was reported in soil <br /> sample MW3-30 at a concentration of 0.038 mg/kg. Soil samples <br /> MW2-30, MW3-10, and MW3-20 were analyzed for TOC. TOC was <br /> present in samples MW3-10 and MW3-20 at concentrations of <br /> 0.20 mg/kg and 0.18 mg/kg, respectively. <br /> 21 August One paired soil boring (CPT-1) was advanced on-site for cone <br /> 2006 penetration testing to a depth of 100 feet bsg. First-encountered <br /> groundwater was sampled from the initial CPT sounding. Additional <br /> grab groundwater samples and a single soil sample were collected in a <br /> twin boring advanced adjacent to the initial CPT sounding. No <br /> constituents of concern were reported in the CPT-1 soil sample, <br /> collected at 50 feet bsg. Three grab groundwater samples were <br /> collected from boring CPT-1 at depths of 30 feet, 75 feet, and 93 feet <br /> bsg. TPH-g was reported in samples CPT1-30-W and CPT1-93-W at <br /> concentrations of 15,000 pg/I and 320 pg/I, respectively. BTEX <br /> constituents were reported in sample CPT1-30-W at concentrations of <br /> 4.1 tag/I of ethylbenzene and 13.7 pg/I of xylenes. MTBE was reported <br /> in all three grab groundwater samples at concentrations of 11,000 tag/I <br /> (CPT1-30-W), 27 tag/I (CPT1-75-W), and 280 pg/I (CPT1-93-W). TBA <br /> and TAME were reported in sample CPT1-30-W at concentrations of <br /> 2,100 pg/I and 39 tag/I, respectively. <br /> June 2007 Pilot soil boring MW-4 was advanced to a total depth of 80 feet bsg and <br /> pilot soil borings MW5 through MW8 were advanced to a total depth of <br /> 30 feet bsg. Soil boring MW-4 was converted to a 2" diameter well, <br /> screened from 70 to 80 feet, while borings MW-5 through MW-8 were <br /> converted to 2" diameter wells, screened from 10 to 30 feet. <br /> No analytes of concern were reported in soil samples analyzed from <br /> pilot borings MW4, MW6 through MW8. <br /> July 2007 A total of four soil probe borings(B7 through 1310)were advanced at the <br /> site to a total depth of 40 feet for collection of soil and grab groundwater <br /> samples. No analytes at or above laboratory detection limits were <br /> reported in soil or grab groundwater samples collected from B7 through <br /> B10, laterally defining the extent of soil and groundwater impact west of <br /> the dispenser and UST area within the water table and second water- <br /> bearing unit (between 70 and 80 feet bsg). <br /> GROUNDWATER BATCH REMOVALS <br /> In January 2010,five groundwater batch removal events, utilizing on-site wells MW-1, MW- <br /> Advanced GeoEnvironmental,Inc. <br />