Laserfiche WebLink
C. Industrial Waste Discharge <br /> I. Is this plant subject to an existing Federal Pretreatment Standard? <br /> Yes No__X_ <br /> 2. Detailed description of operation producing wastes including production <br /> quantities and estimated waste usage (use additional sheets is necessary) . <br /> No current operations. This application is being made to remediate <br /> groundwater that was contaminated by an underground fuel tank. We have <br /> included recent analytical results from monitoring wells at this site. <br /> Only 2 wells show contamination. That well would meet federal discharge <br /> criteria for discharge into a P.O.T.W. Because we will be pumping a large <br /> volume of water from the wells to make sure the contaminated water remains <br /> on site, we believe a dilution effect will occur. We believe the actual <br /> concentration discharged will be less than 1/3 of the concentration on MW#3. <br /> 3. Quantity of Discharge <br /> Maximum Average Daily Nature of Discharge <br /> - Description Time of Discharge Rate Rate Continuous or Intermittent <br /> A. Sanitary Waste <br /> B_ Cooling Tower <br /> Blow down <br /> C. Boiler Blow down <br /> D. Process Wastes I <br /> Groundwater 24 hours frRallons <br /> 0 GPM I 25 GPM Continuous <br /> 72,000 36,000 gallons <br /> er da <br /> Iper day <br /> E. Other <br /> -3- <br />