Laserfiche WebLink
I PIN <br /> v. <br /> WHE Environmental Consultants, Inc. <br /> Health & Safety Plan <br /> Page: 3 <br /> 4.2 Equipment Decu 1:ta111ination <br /> All equipment must be thoroughly washed, rinsed, and certified decontaminated <br /> - before leaving the site, A decontamination station consisting of a vinyl catch <br /> basin and waste collection system shall be established in the contamination <br /> reduction zone. All visible contamination dust and residue :;hall be removed <br /> from all equipment. <br /> 4.3 Personnel Deeonlamination Statins Closure <br /> MI disposable clothing and plastic sheeting used during the operation will be <br /> zed on-site if determined non-hazardaus or <br /> double bagge and either containeri <br /> removed to an approved disposal facility if hazardous. Reusable rubber clothing <br /> will be dried and prepared for future use (if gross contamination has occurred, <br /> additional decontamination may be required). Cloth items will be bagged and <br /> eaning. Al! wash tubs, pail containers, etc., <br /> removed from the site for final cl <br /> will be thoroughly washed, rinsed, and dried prior to removal from the site. <br />