Laserfiche WebLink
S <br /> [Lys <br /> Sampling Protocols <br /> Drilling <br /> A permit will be obtained as necessary for the monitoring well before drilling <br /> be tins. The monitoring well will be accomplished using a mobile mounted drilling <br /> rig employing the use of a hollow stent flight auger no less than 3 114-inch i.d. and <br /> 6 -inch o.d. <br /> All drilling equipment will be thoroughly steam-cleaned before drilling begins to <br /> prevent the introduction of contamination from off site and between borings to <br /> prevent cross contamination. <br /> Tile borings will be logged under the direct supervision of a registered engineering <br /> geologist using the Unified Soil CIassification System. The color, t?xture, moisture; <br /> plasticity (if applicable), consistency of the earth materials, blow counts, pertinent <br /> soil or bedrock characteristics, and any evidence of contamination will be noted. <br /> All water-bearing zones and the depths at which they were encountered will be <br /> noted on these logs. <br /> All borings will be drilled in such a manner as to prevent cross contamination <br /> between strata. Exploratory soil borings within the unsaturatr,d zone will be back- <br /> filled with a concrete slurry mixture. <br /> Borings into the saturated zone will be drilled to a maximum of 20 feet beneath the <br /> top of the aquifer being explored. Any perching layers encountered will be inves- <br /> tigated to a maximum thickness of five feet (5')and will be backfilled with concrete <br /> slurry, after a bentonite seat has been placed. If a deeper aquifer is to be investi- <br /> gated, conductor casing will first be grouted into place to seal off the upper <br /> aquifer(s), in series, if necessary, and drilling will proceed through the conductor <br /> casing after the grout has been allowed to set properly. If evidence of contamination <br /> is noted during the drilling, the drilling will he halted until the responsible profes- <br /> sional determines the advisability of deeper drilling. <br /> Upon termination, the boring into the saturated zone will be completed as a moni- <br /> toring well and backfilled with concrete grout, after a bentonite seal has been <br /> placed. The borinn for the monitoring well will be of a diameter at least four inches <br /> (4") greater than the two inch (2") diameter of the well casing to be used. <br />