My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012578
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
510
>
3500 - Local Oversight Program
>
PR0545486
>
ARCHIVED REPORTS_XR0012578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 6:52:15 PM
Creation date
3/10/2020 3:02:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012578
RECORD_ID
PR0545486
PE
3528
FACILITY_ID
FA0005611
FACILITY_NAME
ROYAL OAKS SAVINGS
STREET_NUMBER
510
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
510 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
740
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i . <br />�.r <br /> Sampling Protocols <br /> Drilling <br /> permits will be obtained as necessary for all wells(including borings) before <br /> drilling begins. The soil boring will be accomplished using a mobile mounted <br /> drilling rig employing the use of a hollow stem flight auger no less than 3 114-inch <br /> i.d. and 8 718-inch o.d. <br /> All drilling equipment will be thoroughly steam-cleaned before drilling begins to <br /> prevent the introduction of contamination from off site and bctwccn borings to <br /> prevent cross contamination. <br /> The borings will be logged (figure 5) under the direct snpe:rvisii�n t)(,, registered <br /> engineering geologist using the Unified Soil (A:,ssificalion System. The color, <br /> texture, moisture, plasticity (if applicable), consistency of the earth materials, blow <br /> counts, pertinent soil or bedrock characteristics, and any evidence of contamination <br /> will be noted. All water-bearing zones and the depths at which they were <br /> encountered will be noted on these logs. <br /> All borings will be drilled in such a manner as to prevent cross contamination <br /> rings within the unsaturated zone will be <br /> between strata. Exploratory soil bo <br /> backfilled with a concrete slurry mixture. <br /> Borings into the saturated zone will be drilled to a maximum of 20 feet beneath the <br /> top of the aquifer being explored. Any perching layers encountered will be <br /> investigated to a maximum thickness of 5 feet and will be backfilled with concrete <br /> slurry, after a bentonite seal has been placed. if a deeper aquifer is to be <br /> investigated, conductor casing will first be grouted into place to seal off the upper <br /> aquifer(s), in series if necessary and drilling will proceed through the conductor < <br /> casing after the grout has been allowed to set properly. if evidence of <br /> contamination is noted during the drilling, the drilling will be halted until the i <br /> -- responsible professional determines the advisability of deeper drilling. <br /> Upon termination, the boring into the saturated zone will be completed as <br /> monitoring wells and backfilled with concrete grout, after a bentonite seal has been <br /> placed. The boring for the monitoring well will be of a diameter at least 4 inches <br /> greater than the 2 inch diameter of the well casing to be used. <br /> The cuttings from the drilling operation will be containerized on-site during drilling <br /> ._... for proper disposition...The proper.method of disposal will be dependent upon <br />
The URL can be used to link to this page
Your browser does not support the video tag.