My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012578
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
510
>
3500 - Local Oversight Program
>
PR0545486
>
ARCHIVED REPORTS_XR0012578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 6:52:15 PM
Creation date
3/10/2020 3:02:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012578
RECORD_ID
PR0545486
PE
3528
FACILITY_ID
FA0005611
FACILITY_NAME
ROYAL OAKS SAVINGS
STREET_NUMBER
510
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
510 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
740
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.may` <br /> FIGURE 4 <br /> 3 ' <br /> DA 71,. WF-t1 H RALE OFDEVEJ.OPIl1Eff1* TIME OF DEVELOPMh'W C;AI I LC MMO <br /> PLLAIPM <br /> 12.3-90 S <br /> 7 31114 180 Afinutes 1,260 <br /> 12-30-90 6 <br /> 7 GPM 140 Minute.+. 980 <br /> 12_.3-y0 ? 7 GPM <br /> 120 Alirures 84 <br /> Wells were developed using a submersible pump, the water was pumped into <br /> a 10,000 gallon tank on site, and the contents were tested prior to discha"Sing <br /> the contents on site. Resu,'ts of analysis are in the Appendices. <br /> DATE WEUH PAIEOFPUMPING TD" GAfCULATM <br /> e FOR Pr UP 7W DEVELOPED GAU ONS PUR91PFD <br /> 12-4-90 <br /> 5 13.5 GPM 580 Minutes 7,830 Gal. <br /> Actual gallons pumped was 10,000 gallons, the well development required surging and <br /> the tan test <br /> periotic shut dawn of the pump. 7"re following the initial developmem, p p <br /> samples were taken using a bailerfrom all 5 wells on site. A second reound of <br /> DevelopmentlSampling was performed on R-28-90 u;nder the supervision of the <br /> San Joaquin County Environmental Health Dept. Development of the 2" wells was <br /> performed prior to sampling, as there were no previous history of these wells being <br /> developed at the time of installation. <br /> SUMMARY OF WH.L DEVU OPMENT <br /> AND PUMPING TLM FOR SECOND SAMPLING ROUND <br /> DATE WELL RA7E OF PUMPING 77ME CALCULATED <br /> FOR PLthfP iES 1 DEVELOPED GAII.QA►S PUMr'Z <br /> I2-28-90 <br /> 2 6 GPM 18o Minutes 1,080 Gallons <br /> 12-78-90 <br /> 4 6 GPM 60 Minutes 360 Gallons <br /> ' i2-28-90 <br /> 5 6 GPld 60 Minutes 360 Gallons <br /> ,.•, 12-28-90 <br /> 6 6 GPM 60 Minutes 360 Gallons <br /> _......__ 6 GPM----...— 60 Minu{es.-..._ 360 Gallons <br /> - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.