My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012578
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
510
>
3500 - Local Oversight Program
>
PR0545486
>
ARCHIVED REPORTS_XR0012578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 6:52:15 PM
Creation date
3/10/2020 3:02:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012578
RECORD_ID
PR0545486
PE
3528
FACILITY_ID
FA0005611
FACILITY_NAME
ROYAL OAKS SAVINGS
STREET_NUMBER
510
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
510 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
740
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�L. <br /> WHF ENVIRoNMrNTAL CoNSUI.TANTS, INC. <br /> Ilealth & Safely Plast <br /> r 1.0 IIEALTII AND SAFETY PLAN <br /> WHF Environmental Consultants, Inc. has adopted the following healtl and safety <br /> procedures for working with organic vapors and liquid contaminants encountered <br /> during drilling and excavation of subsurface soil. The purpose of this program is to <br /> provide health and safety precautions ohave itial n deduced Sequent site visits until the <br /> nature and magnitude of the contaminants <br /> 1.1 Personnel.�espoltsibilities <br /> r site <br /> y All personnel assigned or involved <br /> remedial Tl outlinedtlgation responabilikicsleivilt <br /> ups will have an assigned <br /> establish standards for personnel protective wear,rosafety <br /> ect aperatians�s and provide <br /> for emergency actions which could arise during Q j p <br /> 1,2 Project lifanager(Pill) <br /> The Project Manager directs all project operations. Project M inag v res o, in <br /> cooperation with the Project Safety Officer (PSO), has the full underst�d by <br /> bility for ensuring that the safety plan is read, signed, Y <br /> all employees and outside persons allowed aroun, 01 within designated working <br /> perimeters of the job site. <br /> is <br /> that at <br /> times <br /> In cooperation with thall employees adheree for strictlyto the ensuring <br /> and lSafety <br /> during project operations, <br /> Plan. <br /> 1,3 Project Safety officer(PSO) <br /> The PSO shall direct and ensure rth arall <br /> responsibilitymploeforPly wwith the Health and <br /> Safety Plan. The PSO has th p y <br /> 1. Assuring that appropriate personnel protective equipment is available and <br /> p <br /> properly utilized by all on-site personnel. <br /> 3.= <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.