My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012578
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
510
>
3500 - Local Oversight Program
>
PR0545486
>
ARCHIVED REPORTS_XR0012578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 6:52:15 PM
Creation date
3/10/2020 3:02:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012578
RECORD_ID
PR0545486
PE
3528
FACILITY_ID
FA0005611
FACILITY_NAME
ROYAL OAKS SAVINGS
STREET_NUMBER
510
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
510 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
740
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
uT <br /> Ell <br /> TWIF Environmental Colasull arlfs, Inc. <br /> Ileaalth & Safety P11411 <br /> PUb'C: 3 <br /> 2.0 SAFLTYIMI1LEt1IENTATIDN <br /> The provisions of the WHF Environmental Consultants, Inc. Health and Safety Plan <br /> are mandatory for all personnel associated with the site project and operations. <br /> A complete background review and site visitation will be conducted in order to deter- <br /> mine whether specific amendments are to be made to the Health and Safety Plan based <br /> on specific characteristics which may exist on the job site. Any suspected hazards <br /> associated with the on-site operation which exposure to, via inhalation or skin absorp- <br /> tion, to such as suspected carcinogens or human sterilants, will be documented and <br /> specific guidance will be developed and added to this Health and Safety Plan as <br /> Appendices. <br /> A defined project site layout is paramount to the safe completion of all remedial site <br /> investigations. The project site layout has built-in safety features. hesae is protective <br /> into three zones. The following list defines the eq personnel <br /> equipment. <br /> 2,1 Personnel Protective Equipment (PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site <br /> will use the following protective equipment and measures as warrant by the <br /> Project Manager; <br /> - Coveralls as an undergarment <br /> - Saranex outer garment <br /> - Sample gloves (inner) <br /> - - PVC, Nitrile or Neoprene outer gloves <br /> - Hard hat <br /> - Steel toe boots <br /> - Robars or Tingley boots <br /> - Full face-piece respirator with R53HE cartridges (a combination of <br /> organic vapor, acid gas, pesticide, radionuclide, high efficiency filter). <br /> Note that cartridges should be changed daily. <br /> ——- _--- - Alf joints to be tape - - <br /> ----- ------- --------- ------- <br /> - Self-contained air will be utilized if project dictates <br />
The URL can be used to link to this page
Your browser does not support the video tag.