Laserfiche WebLink
WELL DEVELOPMENT/SAMPLING DOCUMENTATION FORM <br /> Project Name: CS1�al6le- Job# 3r?6 7 Well# <br /> Dates: -13—, >3 Samples ID: �✓r <br /> F <br /> piing Team:ose of ❑ Initial �Quarter!Y Sampling: ❑ Verification Other: <br /> Weather Conditions: 6 "fi <br /> GROUNDWATER LEVEL/CASING VOLUME <br /> Conversion Casing <br /> Description Time Depth Total Depth Feet of Water Factor Volume <br /> TOC to GW ft. togals.) (gallons) <br /> Initial ?_a a �4 <br /> After development! <br /> Purging <br /> At Time of Three Casing Volumes .° Gals <br /> Sam lin G 2 Ten Casing Volumes Gals <br /> I <br /> WELL DEVELOPMENT/PURGING <br /> Equipment: ,�Submerisible Pump ❑ Bailer ❑ Sandpiper Other: <br /> Method: <br /> Description <br /> Decontamination Method: <br /> Description <br /> Water Containment: KDrums ❑ Baker Tank y ..: ❑ Treatment System "-❑ Other: <br /> Ldmimeled: <br /> Start Time Volume Water Temperature EC pH Observation <br /> Extracted °FPC mV Color,Turbiti , Oils, Odor <br /> avl1. <br /> -r- <br /> 7' C3 <br /> �� �n� r SAMPLE INFORMATION <br /> Lab: l! � <br /> Sampling Containers/No. of Containers Preservation <br /> ❑ 1 Liter Amber ❑ Ice ❑ Other <br /> OC 40 ml VOA k !�!( L - D Ice ❑ Other <br /> ❑ Other ❑ Ice ❑ Other <br /> Device: A-Baller, Disposable ❑ Other <br /> Pertinent Observations: <br /> tions From Standard Sampling Protocol: <br /> GHH ENGINEERING INC. <br /> 11960 Heritage Oak Place, Suite 213,Auburn, CA. 95603 (530) 886.3100 <br />