Laserfiche WebLink
FOURTH QUARTER,2002 <br /> GROUNDWATER MONITORING REPORT <br /> AND ADDITIONAL ASSESSMENT REPORT <br /> JAMAR OIL DISTRIBUTION <br /> MARCH 2003 <br /> PREPARATION OF REPORT <br /> Firm Preparing Report: <br /> GHH Engineering, Inc <br /> 11960 Hentage Oak Place #2B <br /> Auburn, California 95603 <br /> Report Prepared By: <br /> This report was prepared by GHH Engineenng, Inc Mr Thomas E Ballard (R G #7299), <br /> Principal Geologist, is the qualified person responsible for overseeing this project Tins report <br /> was written by Mr James Peeler, Staff Geologist, and reviewed for technical content by Mr <br /> Ballard <br /> The analysis, conclusions and recommendations submitted in this report are based upon the best <br /> available information obtained from the field investigation, persons knowledgeable about the site, <br /> and local government agencies However, the regulatory agencies may have additional <br /> reconunendations after they have reviewed and evaluated the data All information presented is <br /> believed to be factual unless proven otherwise This report was prepared to assist the property <br /> owner in the evaluation of the site <br /> This report has been reviewed by the client and they concur with the findings herein If you have <br /> any questions or need additional information, please call GHH at (530) 886-3100 <br /> Th ou, <br /> xk C2eV G EOto s <br /> T/ E Ballard, R GLU <br /> - <br /> Executive Director IVOOSESW�o <br /> s� o� <br /> �rE <br /> OF C <br /> James Peeler <br /> Staff Geologist <br /> F 151871JP\ln\QMR4thQtr2002 <br /> • <br /> PC Mr Marty Hartzell, CVRWQCB (Regional Board) <br /> Ms Lon Duncan, San Joaquin County <br />