Laserfiche WebLink
Project Location STOCKTON Log of Soil Boring No. HP- 1 <br /> Date Started 1/16/2043 Total Depth 100' <br /> Date Completed 1/16/2003 Seal Cement Grout <br /> Logged By d P Checked By from 100 to 0 4 <br /> Asphalt from 0 4" to Surface <br /> Grilling Co FISCH Dnller Rick <br /> Drilling Method Geoprobe Drill Bit Diameter 1 5" <br /> Drilling Equipment 6600 Sampler CA SPLIT SPOON <br /> 0 sn Uthologic Description Lithology E slow Remarks <br /> fl Counts <br /> Surface Elevation <n <br /> EM <br /> (SEE CPT LOG FOR REST <br /> OF LITHOLOGY) <br /> 5 <br /> 10 <br /> 15 <br /> LIGHT BROWN CLAYEY SILT, SLIGHTLY MOIST, NO ODOR ML 1 ppm <br /> 20 <br /> 25 <br /> BROWN SILTY SAND, SLIGHTLY MOIST, SLIGHT HYDROCARBON SM 30 ppm <br /> ODOR <br /> 30 <br /> 35 <br /> � � 11960 Heritage Oak Place Project Name .1AMAR <br /> Auburn, CA 95603 Project # 5187 <br /> ENGINEERING, INC (530) 886-3100 Page 1 of 3 <br />