Laserfiche WebLink
V <br /> �t Former Beacon Station A 2474 December 22, 2003 <br /> Stockton, California„ _ _ Work Plan Addendum <br /> • Groundwater sampling adjacent to the CPT-3 boring was attempted at five intervals: 60 to <br /> 65 feet bsg; 65 to 75 feet bsg; 90 to 95 feet bsg; 119 to 129 feet bsg; and 144 to 146 feet bsg. <br /> Further advancement of the groundwater sampling tool was refused at 146 feet bsg. <br /> Groundwater samples were successfully collected from the three intervals 90 to 95 feet bsg <br /> (sample CPT3-95); 119 to 129 feet bsg (sample CPT3-129); and 144 to 146 feet bsg <br /> (sample CPT3-146). The intervals 60 to 65 feet bsg and 65 to 75 feet bsg were dry. <br /> The soil and groundwater samples were submitted to Kiff Analytical LLC and analyzed for <br /> total petroleum hydrocarbons as gasoline (TPHg), the volatile aromatic compounds benzene, <br /> toluene, ethylbenzene, total xylenes, the fuel oxygenates methyl-t-butyl ether (MTBE), <br /> diisopropyl ether (DIPS), ethyl-t-butyl ether (ETBE), tert-amyl methyl ether (TAME), tert- <br /> butanol (TBA), and the lead scavenger compounds 1,2-dichloroethane (DCA) and 1,2- <br /> dibromoethane (EDB) by Environmental Protection Agency method 8260B. Groundwater <br /> and soil analytical results are summarized in the attached Tables 1 and 2. The analytical <br /> report is attached to this letter. <br /> Groundwater analytical data indicate: <br /> • no hydrocarbon impact at the water-table depth (approximately 62 feet bsg) at the CPT-2 <br /> location; <br /> • vertical delineation of DCA not demonstrated at CPT-2 location; <br /> near reporting-limit concentration of DCA indicated at 146 feet bsg at CPT-3 location; <br /> and <br /> • vertical delineation of TPHg demonstrated at both CPT-2 and CPT-3 Iocations. <br /> Horizon proposes to install monitoring wells MW-15 and MW-16 in the southeast and <br /> southwest corners of the site, respectively, as shown on Figure 2. Monitoring well MWA 5 <br /> should be screened over the interval 143 to 148 feet bsg to confirm the results of the CPT-3 <br /> groundwater sample collected at 146 feet bsg. Monitoring well MW-16 should be screened <br /> over the interval 137 to 142 feet bsg to evaluate the vertical extent of DCA reported in the <br /> CPT-2 groundwater sample collected at 108 feet bsg and to confirm conditions at <br /> approximately 140 feet bsg. Groundwater analytical results from the proposed monitoring <br /> wells.should be evaluated for several quarters to confirm the preliminary results of the CPT <br /> groundwater analytical results. <br /> Analytical results for the soil sample collected at 80 feet bsg from the CPT boring B-11 <br /> indicate no hydrocarbon impact. This analytical result indicates that there is no secondary <br /> source of hydrocarbons in soil in the area of monitoring well MW-1 and MW-9. <br /> W PAddrn 12-03.doc <br /> Project No. 1474.14 2 HORIZON ENVIRONMENTAL INC. <br />