My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005247
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
3500 - Local Oversight Program
>
PR0545495
>
ARCHIVED REPORTS_XR0005247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 6:52:20 PM
Creation date
3/10/2020 4:25:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005247
RECORD_ID
PR0545495
PE
3528
FACILITY_ID
FA0006423
FACILITY_NAME
STOCKTON MOBIL 2
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The composite characterization samples will be collected from the stockpiled soil by <br /> selecting random locations accessible around the soil pile, removing approximately six <br /> inches of sal, and driving a clean brass sleeve into the soil pile at the selected location The <br /> number of samples collected will be based on the estimated amount of stockpiled soil <br /> Generally, one composite soil sample is collected per 50 or 100 cubic yards of soil The <br /> samples collected will be prepared and chilled for transport under Cham-of-Custody <br /> protocol, and sent to a State-certified laboratory for the analyses requested <br /> 40 GROUNDWATER DEPTH EVALUATION <br /> Depth to groundwater will be measured to the nearest 0 01-foot using an electronic hand- <br /> held water level indicator The tip of the probe will be examined to evaluate whether <br /> separate-phase hydrocarbon (SPH) sheen was present <br /> 5.0 MONITORING WELL DEVELOPMENT/PURGING AND SAMPLING <br /> Following installation, the wells will be surged with a surge block to remove fines from the <br /> sand pack After surging, groundwater will be purged from each well using a bailer or <br /> centrifugal pump to remove sediment and enhance representative sample quality <br /> Groundwater sampling events conducted after the initial well development will be preceded <br /> by purging a minimum of three well casing volumes as described above Purge water will <br /> be monitored for the parameters temperature, pH, and conductivity until stabilized Wells <br /> will be allowed to recharge to 80% before sampling If wells dewater, they will be allowed to <br /> recharge for a minimum of one hour prior to sampling <br /> After the water levels within the wells stabilized, a sample will be collected with a clean <br /> disposable bailer Samples will be contained in air-tight vials, packed on ice, and <br /> transported to the laboratory for analysis Groundwater samples will be transported to the <br /> laboratory and analyzed within the EPA-specified holding time for requested analyses <br /> Each sample container submitted for analysis will have a label affixed to identify the fob <br /> number, sample date, time of sample collection, and a sample number unique to that <br /> sample Samples will be analyzed by a California-certified laboratory <br /> A Chain-of-Custody form will be used to record possession of the sample from time of <br /> collection to its arrival at the laboratory When the samples are shipped, the person in <br /> custody of them will relinquish the samples by signing the Cham-of-Custody form and <br /> noting the time The Sample Control Officer at the laboratory will then verify the sample <br /> integrity and confirm that the sample was collected in the proper container, preserved <br /> correctly, and that there is an adequate volume for analysis <br /> 6.0 WELLHEAD TOP OF CASING MEASUREMENT <br /> The top of each new well riser will be surveyed to allow correlation of the groundwater <br /> levels at the site The surveyed point on each well riser will be marked to help insure future <br /> groundwater level measurements are taken from the same location All measurements will <br /> be surveyed to the nearest 0 01-foot relative to a surveyed benchmark for Global <br /> Positioning System (GPS) locations (X and Y coordinates) and elevations (Z coordinates) <br /> • <br /> Project No 1463-11 B -2 HORIZON ENVIRONMENTAL INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.