Laserfiche WebLink
Y <br /> r <br /> N STREET <br /> SB-1 <br /> MW-2 <br /> -48.79 <br /> O`Spenser Islg�r' SB-2 <br /> -48.7 <br /> MW-3 <br /> -48.77 <br /> 'Underground� <br /> Storage , <br /> ' Tanks <br /> MW-1 Sales SB-3 O¢ <br /> Building m <br /> -48.75 <br /> . m <br /> c <br /> J <br /> ID <br /> N <br /> N <br /> 4"Lateral Sewer Line <br /> LEGEND <br /> 10- Monitoring Well <br /> -48.75 Groundwater Elevation in Feet NOTES <br /> • Soil Boring Site Sketch After Site Map <br /> By Acton-Mickelson -van Dam, Inc. <br /> _ — Potentiometric Surface Contour Line All Locations Are Approximate <br /> (Dashed Where Inferred) <br /> 14 Estimated Direction of Groundwater Flow Hydraulic Gradient=a 0.01 ft/ft <br /> Contour Interval-0.02 ft <br /> 0 30 60 <br /> Approximate Scale In Feet <br /> DRAM Had$ POTENTIOMETRIC SURFACE MAP FIGURE <br /> DATE' <br /> March 23,1995 March 13, 1995 2 <br /> ® <br /> ® PEMW Beacon Station#474 <br /> 3440 East Main Street iN <br /> - -- DAM' Stockton,CA 9546-0021 <br />