Laserfiche WebLink
Acton • Mickelson • van Dam, Inc. <br /> Consulting Scientists, Engineers, and Geologists <br /> Log of Soil Boring: MW-2 OVM/OVA; hNu PTD with 10.2 eV probe <br /> Project Number: 19012.04 Drilling Time Date <br /> Start 8:58 AM 12/13/93 <br /> Location: Beacon #474 Finish 1:00 PM 12/13/93 <br /> 3440 East Main Street <br /> Stockton, California Water Depth (Date) : 79.32 Feet (12/13/93) <br /> Drilling Company: V&w oriling Casing Elevation: 99.07 Feet <br /> Drilled By: Robert Vickery Completion Depth: 91.5 Feet <br /> Drilrulg Method: Mobile B-611DX Logged By: T. Del Frate <br /> Sampling Method: California modified split-spoon sampler Checked By: <br /> fitted with 8"brass sample sleeves <br /> y <br /> DESCRIPTION ONSTRUCTIO o V) En COMIIENTS ze i as o <br /> cc 4. GA 5W <br /> Concrete. GL <br /> 5 SILTY CLAY, reddish brown, medium 17 <br /> plasticity, slightly moist. 32 18 12 51 W-2-1 0 <br /> 10 5 <br /> 19 18 12 IV 0 <br /> 15 3 <br /> 13 18 12 W 0 <br /> 20 3 <br /> 5 <br /> 7 18 8 f4 0 <br /> 25 5 <br /> 20 18 12 2T 0 <br /> 30 <br /> (ftkV con0nied on next papal Pape 1 Of 4 <br />