Laserfiche WebLink
Project 113-13-05, Work Plan page <br /> age <br /> r - 'was S - < <br /> n t�RWQ B o, sampled on February 22, 1996, and <br /> gx undwater analysis requirements. All sample�_ erND fo f6r MTBE <br /> meet <br /> _ BEX and MTBE. to <br /> Negligible levels of toluene were p <br /> . , , in-all sam fes, . > r` - <br /> y A letter from S <br /> ind y dated A s <br /> an Joaquin Count " , <br /> F Icated 'that no April 9, 1996, to'the Central VaIIe ' ' <br /> -the,sit with,regardurt t r Investigation; remedial action or rn 3' RWQCB" <br /> he under onitorin a <br /> w S�'ourid'storage tanks formed g Is req ; <br /> S1TE PLAN formerly at this site.- <br /> Y � I4 <br /> T « a ' t <br /> A Site lan <br /> FIg <br /> �' T?ap is attached that Indicates the locations of ` <br /> 1 k - <br /> s_ Eire 2). the foils moliitoi'Illg well <br /> Y e - The of the`work <br /> 't-asks, plan and an estimate for the 1 <br /> sc <br /> - p lect-follow., - <br /> { hediale of the project <br /> a <br /> TASK I-D <br /> -,DEVELOPPLAN <br /> .WORK PLAN <br /> ANDS ' <br /> - E SAFETY P <br /> The <br /> `site safety ply.included Liv , <br /> with this work plan (see attar Y <br /> - + during all held activities. An under o hnient? ' <br /> idea " �,?' and locating service will be em�o ed -sitez ; <br /> trfy underground utilities and other possible subsurface o p Y to <br /> of Level D safety equipment Is re bstacles. A - <br /> submitted to the San Joaquin Coquired for all field activities. mixumum,` <br /> 'die work plan will be ` <br /> Water Quality Control Board, unty Environmental Health Division and Regional ; <br /> TASK 2 - WELL`ABANDQNMENT <br /> A state-registered geologist, G ' <br /> ary D. Lowe " <br /> wells by V & W Drilling a_state-licensed well drillerrvise <br /> theEach well of the four `" =k <br /> entire length. Soil cuttings and well materials will be ll innll be drilled to it's <br /> a local landfill. placed ori a truck for hauling to <br /> After the well is drilled out, the borehole will be filled h 4 <br /> from the bottom of the borehole. Wells that are f av with neat cement and tremied' <br /> finished to grade with asphalt patch. Wells on lawns or lan s surfaces will be <br /> with composted soil to grade dsca in will be finished <br /> P g <br /> TASK 3-PREPARE REPORT - <br /> Following completion of the field work, <br /> ort <br /> work, and the Department of Water Resources Water re <br /> documenting the field <br /> submitted to San Joaquin County Drillers Report will be <br /> Parker Environment., Services, 190 <br /> phone 415 East 7th Street, Pittsburg <br /> CA -94565„2317 <br /> ( ) 439-1024 Fax (415) 439-2566 <br />