My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004397
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
890
>
3500 - Local Oversight Program
>
PR0545488
>
ARCHIVED REPORTS_XR0004397
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 8:02:08 AM
Creation date
3/10/2020 4:59:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004397
RECORD_ID
PR0545488
PE
3528
FACILITY_ID
FA0001393
FACILITY_NAME
MANTECA LIQUOR & FOOD
STREET_NUMBER
890
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22302007
CURRENT_STATUS
02
SITE_LOCATION
890 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD OPERATING PROCEDURES <br /> Groundwater Monitoring Well or Extraction Well Installation and Development <br /> WELL INSTALLATION <br /> The bore holes for monitoring or extraction wells (wells) are drilled using a truck <br /> mounted hollow-stem auger drill rig The diameter of the borehole is a minimum <br /> four inches larger than the outside diameter of the well casing when installing the <br /> well screen (DWR Publication 74-81) The hollow-stem auger provides minimal <br /> interruption of drilling, and permits soil sampling at desired depths All wells are <br /> installed by state licensed drillers <br /> The wells are cased with threaded, factory slotted or blank Schedule 40 PVC plastic <br /> The perforated interval consists of slotted casing, generally 0 020 inch wide by 15 <br /> inch long slot size, with 42 slots per linear foot of pipe. A threaded PVC cap is <br /> fastened to the bottom of the casing Centering devices may be fastened to the casing <br /> to assure even distribution of filter material and grout within the bore hole <br /> annulus. The well casing is thoroughly washed and steam cleaned prior to <br /> installation <br /> After setting the casing inside the hollow stem, sand or gravel filter material is <br /> poured into the annular space to fill from the bottom of the boring to one foot above <br /> the slotted interval A 1 _ 2 foot thick bentonite plug is placed above the filter <br /> material to prevent the grout from infiltrating down into the filter material. Neat <br /> cement, containing about 5% bentonite, is then tremied into the annular space from <br /> the top of the bentonite plug to the surface A lockable PVC cap is placed on each <br /> well head Traffic rated flush mounted steel covers are installed around well heads <br /> for wells in paved areas, while steel stove pipes are usually set over well heads in <br /> landscaped areas <br /> WELL DEVELOPMENT <br /> After installation, the wells are thoroughly developed to remove residual drilling <br /> materials from the well bore, and to improve well performance by removing any <br /> fine material in the filter pack that can pass from the native material into the well <br /> Well development is performed is performed in accordance with California <br /> Regional Water Quality Control Board (RWQCB) procedures described in the <br /> Leaking underground Fuel Tank (LUFT) Field Manual, the Tri-Regional Board Staff <br /> Recommendations for Preliminary Evaluation and Investigation of Underground <br /> Tank Sites, and local regulatory guidelines <br /> Parker Environmental Services 4185 Rialto Court Pittsburg CA 94565-6116 <br /> Phone (510) 439-1024 Fax (510) 439-2566 <br />
The URL can be used to link to this page
Your browser does not support the video tag.