My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1804
>
3500 - Local Oversight Program
>
PR0545493
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 8:23:22 AM
Creation date
3/11/2020 8:21:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545493
PE
3528
FACILITY_ID
FA0009460
FACILITY_NAME
Stockton Center - EBMUD
STREET_NUMBER
1804
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14505027
CURRENT_STATUS
02
SITE_LOCATION
1804 W MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8-94 <br /> Black&Veatch conducts 3rd quarter 1994 QME. <br /> 9-94 <br /> EBMUD submits Site Assessment and Remedial Options Report and Addendum No. 1, Remedial Action <br /> Plan to SJPHS and CVRWQCB. <br /> 11-94 <br /> Black&Veatch conducts 4`'' quarter 1994 QME. <br /> 3-95 <br /> Black&Veatch conducts I" quarter 1995 QME,and step draw down test of site aquifer. <br /> 4-95 <br /> EBMUD submits Remedial Action Plan Addendum No. 1 to SJCPHS and CVRWQCB. <br /> 5-95 <br /> EBMUD receives the WDR from the CVRWQCB for the remedial action proposal.Black&Veatch <br /> conducts 2nd quarter 1995 QME. <br /> 8-95 <br /> Black&Veatch conducts 3`d quarter 1995 QME,and step draw down test of site aquifer. <br /> 12-95 <br /> Black&Veatch conducts 4`h quarter 1995 QME,and'step draw down test of site aquifer. <br /> 3-96 <br /> EBMUD submits Remedial Action Plan Addendum No.2 to SJCPHS and CVRWQCB. <br /> Black&Veatch conducts first semester 1996 semi-annual QME. <br /> 4-96 <br /> Black&Veatch conducts contaminant fate&transport modeling- <br /> 5-96 <br /> Black&Veatch prepares draft Final Closure Report and submits to SJCPHS. <br /> 11-96 <br /> Black&Veatch prepares Final Closure Report and submits to SJCPHS. <br /> 1-97 <br /> SJCPHS conducts Technical Review Committee evaluation of site Final Closure Report. Closure vote is <br /> unanimous with conditions. Conditions listed in January 16, 1997 SJCPHS correspondence to EBMUD <br /> (attached). <br /> j 6-97 <br /> SJCPHS receives Addendum to Final Closure Conditions Report(attached). <br /> 7-97 <br /> EBMUD provides final information for closure summary to SJCPHS. <br /> 8-97 <br /> SJCPHS prepares site for closure preparing all required data for review by CVRWQCB review and closure <br /> concurrence (see attached document list by EBMUD). <br />
The URL can be used to link to this page
Your browser does not support the video tag.