Laserfiche WebLink
ANALYTICAL METHODS AND-REQUIREMENTS <br /> 1 . <br /> The analytical methods, quantitation limits, containers, preservation, and <br /> f ' holding times for each of the required analyses are specified in the following tables. <br /> These analytical requirements for soil are specified in Table C=1, for groundwater in <br /> Table C-2, and for IDW in Table C-3.. Quantitation limits for each of the volatile <br /> organic analytes, semi-volatile, organic analytes, and CAM metals are presented in <br /> Tables C-4, C-5, and C-6, respectively. <br /> The turn around time for all analyses except the HydroPunch III <br /> samples, is 10 working days. The HydroPunch II® samples require a 24 hour turn <br /> around time for analysis. <br /> L All of the soil androup w <br /> g d ater samples will be grab samples. The IDW <br /> samples will be composite samples. <br /> L� <br /> L.� <br /> L <br /> 93822 East Bay Municipal Utility District <br /> 40429200.wp C-1 Work Plan-Stockton Service Center <br />