Laserfiche WebLink
' Consequently, the locations of the injection wells are estimated, based on historical <br /> data, slug test data, and information gathered during the visual site inspection A <br /> computer model of the bioremediation system (including groundwater flow patterns, <br /> and the growth of the biofilm) may be performed to maximize flow and minimize the <br /> ' potential of hydrocarbon migration The results of the model should reveal the <br /> optimum spacing for the injection wells Analytical, as well as hydrogeologic data, <br /> ' indicate that MW-01 and HP-5 are located near the edge of the petroleum <br /> hydrocarbon plume With an anticipated radius of influence of 30 feet, the <br /> downgradient location of MW-01 is optimal as an injection point MW-01, which is <br /> ' a 2-inch diameter PVC-cased well, will be converted into an injection well <br /> Groundwater was encountered at a depth of 12 feet bgs in this well <br /> The analytical results presented in the ASA/RO Report indicate that elevated <br /> levels of total petroleum hydrocarbons as gasoline (TPH-g) and benzene, toluene, <br /> ethylbenzene, and total xylenes (BTEX) were detected in HP-5 HP-5 is upgradient <br /> of the zone of contamination and downgradient of the former USTs Waste Science <br /> proposes to place an injection well (MW-11) approximately 10 feet upgradient of <br /> HP-5 This placement should allow all the impacted groundwater to be affected by <br /> the injection well. <br /> MThe third injection well (MW-10) will be placed between HP-6 and HP-7, <br /> approximately 10 feet west of MW-08 The location of the third injection well is <br /> ' outside the plume boundaries, but within the capture zone Both newly installed <br /> injection wells (MW-10 and MW-11) will be drilled to a depth of 25 feet bgs and <br /> completed in accordance with the SJCPHS standards as 2-inch diameter PVC wells <br /> The wells will be screened from 5 feet to 25 feet with 0 02-inch factory slotted screen <br /> It is anticipated that the low levels of TPH-g and BTEX detected in MW-09 will be <br /> captured by the combined radii of influence of injection wells MW-01 and MW-10 <br /> Upon concurrence of this RAP, well construction details will be provided as part of <br /> the well pernnt application process <br /> The extraction and injection wells will be connected via a 2-inch PVC pipe to a <br /> 1,000 gallon mixing tank, thereby, creating a "closed loop" system An injection and <br /> sample monitoring port, an in-line mixer, and an air pump will be placed in-line <br /> between the extraction well (MW-08) and the tank The purpose of the in-line mixer <br /> ' and the air pump is to provide optimum oxygenation to accelerate the growth of <br /> naturally occurring bacteria and increase enzymatic activity ETEC's enzymatic <br /> complex will be introduced into the extracted water stream as it travels to the mixing <br /> 9488 East Bay Municipal Utility Dtstnet <br /> 40429601 rap 9 Remedial Action Plan <br /> i <br /> I <br /> 1 <br />