Laserfiche WebLink
groundwater during the verificationP eriod, re-establishment of the bioremediation <br /> system will be started at the District's direction <br /> ' 3.0 Remediation-Derived Waste <br /> Solid and liquid wastes generated during the remediation will be containerized <br /> and temporarily stored onsite pending waste characterization analysis It is <br /> anticipated that all waste generation will be from installation and sampling activities <br /> No waste products are generated by the bioremediation process itself <br /> ' At the completion of remedial activities, composite solid and liquid waste <br /> samples will be collected and submitted to the District's laboratory for waste <br /> characterization analyses These analyses will be performed in accordance with the <br /> ' specifications outlined in the July 1993, Additional Site Assessment and Quarterly <br /> Monitonng Work Plan Upon receipt of the waste characterization results, the <br /> ' remediation-derived wastes will be disposed of in accordance with applicable <br /> regulations at a District-approved disposal facility <br /> 4.0 Site Safety Plan <br /> Upon concurrence of this RAP, modifications to the existing approved site safety <br /> plan for the site will be generated and provided to the SJCPHS for approval <br /> ' 5.0 Reporting <br /> P 9 <br /> ' A remediation report will be prepared by Waste Science upon completion of the <br /> remedial activities This report will document the remedial field activities, present <br /> ' the results of the remediation, and evaluate the effectiveness of the remediation A <br /> final report documenting the effectiveness of the remedial solution, will be prepared <br /> at the end of the one year verification monitoring period as an addendum to the <br /> remediation report <br /> 9488 East Bay Municipal Utility District <br /> 40429601 rap 14 Remedial Action Plan <br />