Laserfiche WebLink
6.0 Proposed Future Activities <br /> BVWST plans to conduct Second Quarter 1994 groundwater monitoring in May <br /> 1994 in accordance with the Work Plan A Remedial Action Plan (RAP) was <br /> developed and submitted to the District for review in April 1994 The RAP details <br /> the design of the proposed remedial alternative, bioremediation, for the Stockton site <br /> Based on initial estimates by the bioremediation subcontractor, Aproteck, the <br /> ' anticipated duration of the remediation project is 2 to 3 weeks The placement of <br /> the extraction/infection wells will be made such that any potential groundwater <br /> ' contamiantion at MW-9 will be within the estimated capture radius of the extraction <br /> well The RAP will be implemented upon approval by SJCPHS and the District, and <br /> once the appropriate permits from the RWQCB have been obtained <br /> i <br /> I <br /> ' 94R$ East Bay Municipal Utility District <br /> 40429600lstgtrgw 13 Stockton Service Center First Quarter 1994 <br />