My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 4:59:23 AM
Creation date
3/11/2020 10:59:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mate Vviter Resources Contrc;�Board <br /> Division of Clean Water Programs <br /> 2014 T Street•Sacramento.California 95814•(916)227-4411 <br /> Winston H. Hickoz Mailing Address: P.O.Box 944212•Sacramento,Cali romia•94244-2120 <br /> Secretary for FAX(916)227-4530•Intemet Address: http://wwwswmb.ca.gov/-cwphome/ustcT r-• 00 <br /> Environmental <br /> Protection <br /> Ron Schwab <br /> Unocal Corp. <br /> 376 Valencia Ave S #A-113 <br /> Brea, CA 92823-6345 <br /> UNDERGROUND STORAGE TANK CLEANUP FUND PROGRAM, PROGRAM <br /> MAN AGEP.DECISION FOR ELIGIBILITY DETERMINATION: CLAIM NUMBER 013532; <br /> FOR SITE ADDRESS: 2701 MARCH LN W, STOCKTON <br /> I have received your request for a Program Manager Decision. After review of the request and <br /> supporting arguments, I have decided to find in your favor and to accept the claim on the Priority <br /> List in Priority Class "D". <br /> Not all costs may be eligible. Any cost related to work on catch basins or drains is <br /> ineligible. Any cost associated with spills and negligence is ineligible. The release <br /> discovered July 31, 1995 is the only eligible release identified. <br /> Compliance Review: After adoption of the Priority List, staff will review,verify, and process <br /> applications based on their priority and rank within a priority class. During this Compliance Review, <br /> staff may request additional information needed to verify eligibility. Once review of the application is <br /> complete and the claim is determined to be valid, a Letter of Commitment will be issued obligating funds <br /> toward the cleanup. After the compliance review, your claim may be rejected if division staff determine <br /> that you have not complied with regulations governing site cleanup,your have not supplied necessary <br /> information or documentation, or your claim application contains a material error. In such event,you will <br /> be issued a notice of intended removal from the priority list, informed of the basis for the proposed <br /> removal of your claim, and provided an opportunity to correct the condition that is the basis for the <br /> proposed removal. Your claim will be barred from further participation in the Fund, however, if the <br /> claim application contains a material error resulting from fraud or intentional or negligent <br /> misrepresentation. <br /> Record keeping: During your cleanup project you should keep complete and well organized records of <br /> all corrective action activity and payment transactions. if you are eventually issued a Letter of <br /> Commitment, you will be required to submit: (1) copies of detailed invoices for all corrective action <br /> activity performed(including subcontractor invoices), (2) copies of canceled checks used to pay for work <br /> shown on the invoices, (3) copies of technical documents (bids, narrative work description,reports), and <br /> (4) evidence that the claimant paid for the work performed(not paid by another party). These documents <br /> are necessary for reimbursement and failure to submit them could impact the amount of reimbursement <br /> made by the Fund. It is not necessary to submit these documents at this tine; however, they will <br /> definitely be required prior to reimbursement. <br /> California Environmental Protection Agency <br /> 0 RecycledPaper <br />
The URL can be used to link to this page
Your browser does not support the video tag.