My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 4:59:23 AM
Creation date
3/11/2020 10:59:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ETTLER -GYAN INC. J-Fr~t;, � f <br /> � � V <br /> April 16, 1997 <br /> Mr. Ron Rowe R.E.H.S. <br /> San Joaquin County Public Health Services <br /> Environmental Health Division, Site Mitigation Unit <br /> 304 East Webster Street <br /> Stockton, California 95201 <br /> Reference: Unocal SS #5886 <br /> 2701 West March Lane @ I-5 <br /> Stockton, California <br /> Mr. Rowe: <br /> Per your request, Gettler-Ryan Inc. would like to provide you with. the <br /> following work scope for the drain inlet closures at the referenced location. <br /> Work scope as follows: <br /> o Clean all 6 ea. drain inlets and associated drainage piping with "Steam <br /> Hydro Snake". <br /> o Collect rinsaete material at storm drain inlet at most southerly drive <br /> slab. <br /> o Pump and remove rinsaete material from storm drain inlet and put into 55 <br /> gallon drums. <br /> o Properly label drums for temporary storage on site. <br /> o Owner to take liquid samples for analysis and future disposal. <br /> o Close drain inlets as submitted. <br /> Our work scope will also be based on the work description and drawings <br /> previously submitted to you on April 2, 1997 and approved by the City of <br /> Stockton, Department of Utilities. <br /> Please call me if you have any questions or comments. <br /> Sincerely, <br /> Timothy J. Dahl <br /> Construction Project Manager <br /> cc: Mr. Larry Williams, Department of Utilities, City of Stockton <br /> Mr. Lee Georgopoulos, TOSCO Marketing Company <br /> Mr. Bryan Huseman, TOSCO Marketing Company <br /> Mr. Jeffery M. Ryan, Gettler-Ryan Inc. <br /> 6747 Sierra Court, Suite J 0 Dublin , California 94568 (510 ) 551 -7555 <br />
The URL can be used to link to this page
Your browser does not support the video tag.