My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 4:59:23 AM
Creation date
3/11/2020 10:59:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wbLY-Z1-Hb 1HU 11 :W Ut� MV SNUIU MA NU tatlnoC)nnZ)oo r vc <br /> f, . <br /> Aicansullants. Ran Gold Camp O A <br /> Dela s"���°� <br /> Rancho Cordova,CA 95670 <br /> Enviromnentat 9161638-2085 <br /> Inc. FAR:916M"3&5 <br /> September 21, 1995 <br /> Mr. Ron Rowe <br /> San Joaquin Courcy Public Health Services <br /> Environmental Health Division <br /> 304 East Weber <br /> Stockton, California 95201 <br /> Subject: Field Work Schedtde <br /> Unocal Service Station No. 5886 <br /> 2701 West March Lane <br /> Stockton, California <br /> Delta Project No. D095-066 <br /> Dear Mr. Rowe: <br /> As per our conversation on September 19, 1995, Unocal Corporation has scheduled the removal of <br /> the crushed rock from the two canopy footing area on September 22, 1995. It is Delta <br /> Environmental Consultants, Inc. (Delta's), understanding that field work is scheduled to begin at <br /> approximately 8:00 a.m. Following removal of the crushed rock and inspection, drain rock will be <br /> placed back in the bottom of the excavation, if water is present, covered with a geofabric and <br /> backfilled to ground surface with native material. Delta anticipates that the excavation work will be <br /> completed on September 22, 1995. Following the excavation work, Delta is scheduled to begin the <br /> geoprobe. sampling on September 25, 1995, as outlined in the Corrective Action Plan dated <br /> August 18, 1995, and the Addendwn to Corrective Action Plan dated August 23, 1995_ Based on the <br /> number of geoprobes installed, Delta anticipates completing the field work on September 26 or <br /> 27, 1995. <br /> If you have any questions regarding the proposed work or schedule, please call me at(916)638-2085. <br /> Sincerely, <br /> DIELTA.ENVIRONMENTAL CONSULTANTS, INC. <br /> n 1 i�J/f <br /> Eric J. Holm, R.G. <br /> California Registered Geologist No. 5880 <br /> FJH(CLI16&TA) <br /> Providing a Competitive Edge <br />
The URL can be used to link to this page
Your browser does not support the video tag.