My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 3:12:05 AM
Creation date
3/11/2020 11:00:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 7 <br /> I will OK the air knifing AFTER I receive ALL the missing items. so the <br /> applications and the authorization for YOU to sign them, the $375, and a <br /> modified City encroachment permit that shows ATC and not Stantec are to be <br /> submitted and accepted by the EHD/me. <br /> after I receive all you send in, I'll review it for completeness and accuracy and <br /> let you know if all is ok. it's this PHONE call that will act as the ok to start the <br /> air knifing. Please advise of the time you'll have the driller for this phase. This <br /> will give me an idea of how much time to schedule my time or my helpers.. <br /> Oct 3 can work, BUT, all I need with it all correct MUST be on my desk NLT <br /> Sept 28 by 1 pm. I can process that afternoon and parts of Sept 29. after <br /> that, I will not have enough time to review and process since I have field work <br /> already scheduled and I won't be in the office Sep 30. <br /> mike. <br /> ps. Oct 10 is currently open and available and open for that week and most <br /> of the week of Oct 17....currently... but it fills up quickly. <br /> From: Gabe Stivala [mailto:gabe.stivala@atcassociates.com] <br /> Sent: Thursday, September 22, 20119:17 AM <br /> To: Mike Infurna [EH] <br /> Cc: 'Ralston, Ed C.:'; Lathrop, Shelby S (Shaw Environmental, Inc.) <br /> Subject: 2701 March Lane, Stockton Well Destructions <br /> Mike, <br /> Thank you for returning my call regarding the proposed monitoring well destructions <br /> associated with 2701 March Lane in Stockton. As discussed, ATC has taken over the <br /> consulting duties for COP on this project. As such, I understand from you that existing <br /> permits submitted by Stantec cannot be used.The following is my understanding of <br /> the points we discussed regarding the permitting: <br /> 1) Well destruction permits are currently in Stantec's name, therefore ATC will <br /> need to resubmit new applications. <br /> 2) Two permits applications are necessary: one for onsite wells(Mr. Eppler's <br /> property) and one for offsite wells (City of Stockton property). <br /> 3) Stantec's submitted fees will be used toward the project, however they were <br /> $375 short on the amount.ATC should provide and additional check for$375. <br /> 4) The City of Stockton encroachment permit for offsite wells is in Stantec's <br /> name, therefore ATC will need to resubmit or have the encroachment permit <br /> modified before you can approved the offsite well destruction permit. <br /> 5) For offsite permit applications we are to use the 2701 March Lane address. <br /> 6) Changing the drilling sub is not a problem. <br /> 7) Well destruction requires attendance by your department, however air- <br /> knifing prior to destruction does not,.Therefore we can start a day ahead of <br /> the well destruction without your presence. <br /> As mentioned, my desired start date is October 3, however I need to confirm driller <br /> availability today. <br /> 10/3/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.