My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 2:59:09 AM
Creation date
3/11/2020 11:02:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� . 0 <br /> ERI 205503.A01 Unocal Service Station 5886,Stockton, California April 3, 1997 <br /> screened intervals. These screened intervals will be near the interface of the vadose zone and upper <br /> water-bearing zone and the base of the wells. Based on the previous borings logs, ERI expects one- <br /> continuous water-bearings zone. The proposed well construction details are attached. Each casing <br /> with the borehole will be developed and groundwater samples collected in accordance with the <br /> previously outlined protocol. Analyses of groundwater samples collected from each casing will allow <br /> evaluation of the vertical extent of MTBE in groundwater. <br /> To address and disclose the chemicals utilized on site, ERI has attached the Material Safety Data <br /> Sheets (MSDS) for the fuel products utilized by 76 Products Company. <br /> ERI is prepared to implement the work plan within 2 weeks upon regulatory approval and obtaining <br /> appropriate permits. In accordance with your letter, ERI will submit the boring application and <br /> appropriate fee for approval prior to initiating field work. ERI will notify personnel of the San <br /> Joaquin County PHS/EHD to provide the opportunity to witness field work at least 48 hours in <br /> advance. 76 Products Company and San Joaquin County PHS/EHD will be notified should any <br /> delays occur. The work will be completed in accordance wit the procedures outlined in ERI'S Work <br /> Plan for Supplemental Environmental Investigation (dated March 28, 1997). <br /> Please call (415) 382-5990 if you have questions regarding this work plan. <br /> Sincerely, <br /> Environmental Resolutions, Inc. <br /> GEOLO <br /> ZIGCO <br /> yti�s� ✓ �i� <br /> uj <br /> C7 Qj3r,, <br /> Keith A. Romstad <br /> Branch Manager <br /> S"47E OF GPS\ <br /> Steve M. Zigan <br /> R.G. 4333 <br /> H.G. 133 <br /> Attachments: Plate 1: Typical Duel Welt Completion Diagram <br /> Unocal Material Safety Data Sheet <br /> cc: Mr. Adadu Yemane, 76 Products Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.