Laserfiche WebLink
� U <br /> Table 1 <br /> Well Construction Details <br /> 76 Station No.5886 <br /> 2701 West March Lane <br /> Stockton,CA <br /> Boring Casing Top of Bottom of Screen <br /> Well Installation Depth Diameter Type Screen Screen Length Proposed Well <br /> v Number Date (feet,bgs) (inches) (feet,bgs) (feet,bgs) (feet) Destruction Method <br /> Monitoring Wells )✓ <br /> MW-1 9/4/1996 25 2 PVC 5 25 20 Over-drill P <br /> MW-2 9/4/1996 25 2 PVC 5 25 20 Pressure Grout, Dtf' <br /> MW-3 9/4/1996 25 2 PVC 5 25 20 Pressure Grout <br /> MW-4S 4/15/1997 26.5 2 PVC 5 15 10 Over-drill <br /> MW-41) 4/15/1997 26.5 2 PVC 22 25 3 Over-drill <br /> MW-5S 4/15/1997 28 2 PVC 5 15 10 Over-drill <br /> MW-51) 4/15/1997 28 2 PVC 20.5 24 3.5 Over-drill <br /> MW-6S 4/15/1997 26.5 2 PVC 5 15 10 Over-dri <br /> MW$D 4/15/1997 26.5 2 PVC 22 25 3 Over-drill ; <br /> MW-7S 4/15/1997 28 2 PVC 7 17 10 Over-drill <br /> MW-7D 4/15/1997 28 2 PVC 23.5 25.5 2 Over-drill <br /> MW-8S 4/8/1999 15 2 PVC 5 15 10 Over-drill <br /> MW-81 4/8/1999 22 2 PVC 17 22 5 Over-drill <br /> MW-8D 4/8/1999 36.5 2 PVC 30 35 5 Over-drill <br /> MW-9S 4/8/1999 15 2 PVC 5 15 10 Over-drill <br /> MW-91 4/8/1999 22 2 PVC 17 22 5 Over-drill <br /> MW-9D 4/8/1999 36.5 2 PVC 30 35 5 Over-drill <br /> MW-10S 4/8/1999 15 2 PVC 5 15 10 Over-drill <br /> MW-101 4/8/1999 22 2 PVC 17 22 5 Over-drill/ <br /> MW-10D 4/8/1999 36.5 2 PVC 30 35 5 Over-drill <br /> UST Cavity Well <br /> See Notes U U U U U U U Bentonite Grout <br /> Ozone arge Wells <br /> S-1 1/21/2002 30 1 PVC 27.5 29 1.5 Pressure Grout! <br /> AS-2 1/23/2002 34 1 PVC 30.5 32 1.5 Pressure Grout <br /> AS-3 1/22/2002 38 1 PVC 29.5 31 1.5 Pressure Grout F <br /> S-4 1/21/2002 33 1 PVC 29.5 31 1.5 Pressure Grout <br /> AS-5 1/22/2002 33 1 PVC 29.5 31 1.5 Pressure Grout <br /> AS-6S 1/24/2002 31 1 PVC 17.5 19 1.5 Pressure Grout + <br /> AS-61) if 1/24/2002 31 1 PVC 26.5 28 1.5 Pressure Grout 1 <br /> AS-7 -� 1/21/2002 32 1 PVC 29.5 31 1.5 Pressure Grout i <br /> AS-8 1/23/2002 30 1 PVC 27.5 29 1.5 Pressure Grout <br /> I AS-9S 1/24/2002 31 1 PVC 18 19.5 1.5 Pressure Groin <br /> AS-9D ! 1/24/2002 31 1 PVC 26.5 28 1.5 Pressure Grout <br /> AS-10 1/23/2002 32 1 PVC 29.5 31 1.5 Pressure Gro <br /> TOC=Top of Casing <br /> bgs=Below ground surface <br /> U=UST Cavity Well was installed during Second Quarter 2000;well construction details are not <br /> available and are currently unknown. <br /> 5886 Well Construction Details.xlsx page 1 of 1 <br />