Laserfiche WebLink
• <br /> ERI 205513 QS5 Tosco 76 Service Station 5886 Stockton California July 30, 1998 <br /> • TPPHg, benzene, and TEPHd were not detected above laboratory method <br /> detection limits in groundwater samples collected from the groundwater monitoring <br /> wells except for 0 85 ug/L benzene detected In the groundwater sample collected from <br /> monitoring well MW4D <br /> • MTBE was not detected above laboratory method detection limits in monitoring wells <br /> MW1, MWSD, MWSS, MW7D, and MW7S MTBE was detected in the remaining <br /> groundwater monitoring wells ranging from 3 3 ugIL to 7,300 ug/L <br /> • Tosco has successfully obtained access agreements from several owners of properties directly <br /> across March Lane (south and southwest) However, Tosco has been unsuccessful in It's <br /> attempts to obtain an access agreement with the owner of the property adjacent to the <br /> western Tosco property boundary to allow off-site use of a cone penetrometer (CP) <br /> The following work is being performed <br /> • Tosco is currently awaiting approval from SJCPHS/EHD of the proposed CP locations <br /> • <br /> • Tosco will continue quarterly groundwater monitoring and sampling at the subject site <br /> • ERI and Tosco will continue to conduct a further comprehensive review of the data acquired <br /> during previous work and present Quarterly Reports to SJCPHS/EHD which describe the <br /> status of the proposed work by the dates established by SJCPHS/EHD <br /> Additionally, Tosco will formally request that SJCPHS/EHD assist Tosco in obtaining an access <br /> agreement with Thompson, Partners Limited, the property owners of 2727 March Lane (IN-OUT <br /> BURGER), Stockton, California to facilitate implementation of the off-site CP investigation The <br /> Thompson, Partners Limited office is located at 1919 Grand Canal Boulevard, #B-5, Stockton, CA <br /> 95207 <br /> The ongoing work will be completed in accordance with the procedures outlined in ERI'S Work Plan <br /> for Supplemental Environmental Investigation (dated July 14, 1997) and Addendum to Work Plan <br /> (dated August 8, 1997) ERI will submit a comprehensive Soil and Water Investigation Report within <br /> 45 days following completion of the field work including Installation of monitoring wells <br /> • <br /> ERI recommends signed copies of this summary report be forwarded to the following <br /> Mr Ronald Rowe, Sr Site Mitigation Unit <br /> San Joaquin County Public Health Services <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> • <br /> • <br /> 4 <br /> • <br />