My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012415
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
ARCHIVED REPORTS_XR0012415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 11:52:06 PM
Creation date
3/11/2020 11:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012415
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nu" cU euut U: e,:jt-n I UbLU MHRK1z- f 1NG 91G7743004 p- 1 <br /> i <br /> PUBLIC HEALTH SERVICES <br /> SAN JOAQUIN COUN'T'Y <br /> ENVIRONMENTAL HEALTH I]MSION m <br /> Karen Furst, M D , M P H , Health Officer <br /> 304 East Weber Avenue, Third Floor- Stockton, CA 95202 <br /> 2091468-3420 <br /> 3 0 <br /> ' ED RALSTON <br /> TOSCO MARKETING COMPANY AUG 17 2001 <br /> 1380 LEAD HILL ROAD SUITE 120 <br /> ROSEViLL,E CA 95661 <br /> RE Tosco Service Station 5886 <br /> 2701 March Lane <br /> Stockton,California <br /> San Joaquin County Public Health Services,Environmental Health Division(PHS/EHD)has reviewed the Quarterly <br /> Summary Report for Environmental Investigation(report),dated July 23,2001,written by Environmental Resolutions <br /> Inc on your behalf On the third page of the report,ERI states that, "dissolved hydrocarbons are delineated both <br /> laterally and vertically in the vicinity of the site- PHS/EHD agrees with this statement Therefore,the next step in the <br /> site investigation is to submit a corrective action plan(CAP)m accordance with Title 23 of the California Code of <br /> Regulations,Chapter 16, Section 2725 A CAP was previously submitted December 28, 1999,but approved as interim <br /> remedial action only Moreover,new technologies have been developed subsequent to the original CAP that might be <br /> successful at this site Therefore,please submit a new CAP to PHS/EHD by October 1,2001 <br /> The interim remedial action CAP was implemented in June 2000,and reinitiated during January 2001 Approximate) <br /> 156,500 gallons of y <br /> g groundwater have been removed from beneath the site since that toric Early results are encouraging, <br /> and concentrations of methyl tertiary butyl ether(MtBE)in groundwater samples collected from onsite monitoring wells <br /> have decreased. Therefore,weekly purging activities should continue at the site until further notice Dunng the January <br /> weekly purge events,groundwater samples were collected from momtonng well MW-3 and the underground storage <br /> tank(UST)cavity well before purging,after purging,and from the purged groundwater itself,as requested by <br /> ' PHS/EHD The sample collected from the purge water was used to calculate an approximate mass of MtBE removal <br /> per event While imperfect, this method does provide an estimate of eonumunant mass removal The value of obtaining <br /> the concentrations of MtBE in groundwater samples collected before and after purging, however, is doubtful and these <br /> results are not used in mass removal calculation. Therefore,reinstate the practice of collecting a sample from the <br /> purged groundwater during weekly purging to calculate an approximate measure of mass removal of MtBE Collecting <br /> and analyzing pre-purge and post-purge samples will not be necessary <br /> In summary, you are directed to tuidertake/commue the following tasks <br /> 1) Submit a CAP to PHS/EHD by October 1,2001 <br /> 2) Continue weekly purging of MW-3 and the UST cavity well <br /> 3) Collect a sample of the purge water for laboratory analysis each week during weekly purge activities <br /> If you have any questions regarding this directive,please call Dot Lofstrom at(209)468-3436 <br /> Donna Heran,REHS,Director <br /> Environmental Health Services <br /> 1 Dot L.ofstrom,KG <br /> LOPISite Mitigation <br /> cc Marty Hartzell, CVRWQCB <br /> Glenn Matteucci,Environmental Resolutions Inc <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.