Laserfiche WebLink
Project No 2(]55 Boring tilb/mwito Flate• Hr-rrJ114J,u <br /> el M MVrAL Site Tosco 76 Service Station 5886 Date 4/8/99 _ <br /> "'- Drill Contractor Woodward Dril in <br /> Sample Method Split Spoon_ _ _ Geologist <br /> Drill Rig. Mobile B57 Bore Hole Diameter 8„- Signature 07 <br /> cation 125 Feet South, 40 Feet West of Southwest Registration <br /> Sit- Comex Logged by Briars in ar <br /> �vzi� �G5 GEOLOGIC DESCRIPTION �tio{ <br /> G Q G cS q <br /> 6” aqphalt- <br /> + + Fill <br /> -- Silty clay, brown, trace of sand (10%), damp <br /> _- <br />