My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012445
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
ARCHIVED REPORTS_XR0012445
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 10:32:02 PM
Creation date
3/11/2020 11:47:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012445
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•ERI 205513 OSR24 76 Facility 5886 Stockton California April 29 2003 <br /> DOCUMENT DISTRIBUTION <br /> ERI recommends signed copies of this summary report be forwarded to the following <br /> Ms Margaret Lagono <br /> Site Mitigation Unit <br /> San Joaquin County Public Health Services <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> Mr Marty Hartzell <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827-3098 <br /> Please call Mr Glenn L Matteucci, ERI's project manager for the site, at(415)382-5994 if you have <br /> questions regarding this summary report <br /> Sincerely, <br /> Environmental Resolutions,Inc <br /> Jennifer Clark <br /> Staff Scientist <br /> John B Bobbitt �0� �p1Latr@p a6t� <br /> RG 4313 <br /> Attachments References <br /> Plate 1 Site Vicinity Map No. 4313 <br /> Plate 2 Generalized Site Plan <br /> Plate 3 On-Site Well Locations <br /> Plate 4 Groundwater Flow Direction Rose Diagram Or �1-�� <br /> Attachment A Gettler-Ryan,Inc,First Quarter Event of February 20 and 21, 2003, <br /> Groundwater Monitoring and Sampling Report(March 26, 2003) <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.