Laserfiche WebLink
TABLE OF CONTENTS <br /> Page No. <br /> 7.0 DECONTAMINATION PROCEDURES............................................................ <br /> 7.1 Personnel Decontamination........................................................................ 7-1 <br /> 7.2 Equipment Decontamination....................................................................... 7-1 <br /> 7.3 Disposition of Decontamination Wastes..................................................... 7-2 <br /> 8.0 STANDARD OPERATING PROCEDURES...................................................... <br /> 8.1 Personnel Precautions................................................................................. 8-1 <br /> 8.2 Operations................................................................................................... 8-1 <br /> 9.0 CONTINGENCY PLAN....................................................................................... <br /> 9.1 Medical Emergencies.................................................................................. 9-1 <br /> 9.2 Emergency Equipment................................................................................ 9-2 <br /> 9.3 Flammable Conditions................................................................................ 9-2 <br /> 9.4 Site Evacuation Conditions......................................................................... 9-2 <br /> 9.5 Emergency Communication System........................................................... 9-2 <br /> 9.6 Emergency Response Follow-up................................................................. 9-3 <br /> 10.0 EMPLOYEE TRAINING............................................ ....................................... <br /> 10.1 Pre-Assignment and Annual Refresher Training........................................ 10-1 <br /> 10.2 Site Supervisor's Training 10-1 <br /> 10.3 Site Safety Training and Briefing Topics.................................................... 10-1 <br /> 10.4 Visitors ....................................................................................................... 10-1 <br /> APPENDICES <br /> APPENDIX A - Job Safety Analysis <br /> APPENDIX B - NIOSH Pocket Guide's Specific Chemical Information Sheets and MSDSs <br /> APPENDIX C - List of Approved Amendments/Changes <br /> Acknowledgement/Agreement Form <br /> Visitors Log <br /> Tailgate Safety Meeting Form <br /> Air Quality Monitoring Record <br /> Equipment Calibration Log <br /> Checklist for Subsurface Clearance <br /> Monthly Heavy Equipment Safety Inspection Checklist <br /> Drill Rig Inspection Checklist <br /> APPENDIX D - Excavating and Trenching <br /> APPENDIX E- Lockout/Tagout Requirements and Procedures <br /> HASP Level III TC-3 <br /> Rev.—(September 17,2012) <br />