My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2900 - Site Mitigation Program
>
PR0540973
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 10:21:19 PM
Creation date
3/11/2020 11:57:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540973
PE
2960
FACILITY_ID
FA0023449
FACILITY_NAME
76 STATION
STREET_NUMBER
1206
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10416004
CURRENT_STATUS
01
SITE_LOCATION
1206 MARCH LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 3-1 <br /> DRILLING/PROBING PROCEDURES <br /> (First 5 feet below surface) <br /> Step 1 - Site <br /> Walk Conduct Site walk. Verify that the Checklist for Subsurface Clearance has been fully <br /> completed. <br /> Step 2 -Locate Locate all utility markouts and borehole locations. Start intrusive activities at least <br /> Markouts five 5)feet awayand perpendicular to all marked utilitylines. <br /> Step 3-Break Use a jackhammer or concrete saw to ba�o <br /> through the asphalt or concrete surface <br /> Surface Cover cover. The drill bit on the rig may also sed on the asphalt cover.Do NOT <br /> advance bit or cutting tools beyond the shalt or concrete cover. <br /> Step 4- Use air knife with vacuum extractors,hand auger, or hand shovel to remove soil from <br /> Surface Boring the borehole to a depth of at least 5 feet below surface.The soil in the borehole <br /> should be excavated to a diameter of at least three inches greater than the diameter of <br /> the drill bit on the lead auger or drill stem that is to be used. <br /> If it is not possible to perform a surface boring which meets the diameter <br /> requirements as stated above, surface borings should be installed to the required <br /> depth of 5 feet surrounding the proposed well/boring location in such a manner that <br /> any lines/utilities passing through the proposed well/boring location will be <br /> encountered while installing the investigation borings/well. <br /> If pea gravel, fill material, or refusal is encountered,and was not expected to be <br /> encountered,abandon the boring and follow instructions from item#9 of section <br /> 5.4.1. <br /> Step 5-Soil If soil samples are required to be collected within the first 5 feet below surface, a <br /> Sam lin hand auger should be utilized to collect native,undisturbed soil sam les. <br /> Step 6- If no piping or other structures are encountered within the first 5 feet below surface, <br /> Borehole normal drill/probe activities may proceed with caution. Containerize drill cuttings as <br /> Protection appropriate. If excavation of the borehole is conducted the day before actual drilling <br /> is conducted,the borehole should be covered with barricades or cones and with a <br /> sheet of material sufficient in strength to support a person's weight until it is ready to <br /> be drilled. If the borehole is of sufficient size to potentially cause damage to a vehicle <br /> if driven over,the borehole should be covered with a material sufficient in strength to <br /> support vehicular weight. In lieu of barricades or cones and a material cover,the <br /> boring may be temporarily backfilled to surface.If a backfill material is utilized,it is <br /> important for the material to be flush with the surrounding pavement. <br /> Risks of injury associated with the drilling operation itself also exist. The risks of working near overhead <br /> electrical lines may also present a safety hazard. The SSHO will check for the presence of overhead lines <br /> and other obstructions. No drilling operations will be performed within 10 feet of overhead lines with <br /> voltages 0-50 kV. For other voltages refer to ATC Electrical Safety Policy(No. 12)and Equipment(Drill <br /> Rigs,Mobile Equipment)Policy(No. 15). <br /> 20160613 Stockton,March Ln 2016 HASP 5-5 <br /> 6/13/16) <br />
The URL can be used to link to this page
Your browser does not support the video tag.