My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2900 - Site Mitigation Program
>
PR0541650
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 8:18:41 PM
Creation date
3/11/2020 2:33:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0541650
PE
2960
FACILITY_ID
FA0023868
FACILITY_NAME
FORMER USA GASOLINE SERVICE STATION 110
STREET_NUMBER
2132
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
1730635
CURRENT_STATUS
01
SITE_LOCATION
2132 E MARIPOSA RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> co P Donna Heran,RENS <br /> m 600 East Main Street <br /> PROGRAM COORDINATORS <br /> ;< Stockton, California 95202-3029 Robert McClelion,REHS <br /> L Jeff Carruesco,REHS,RDI <br /> c'•. -� ,.• P p gov.or /ehd Website: www.s Kasey Foley,REHS <br /> 1 9 Linda Turkatle,REHS <br /> 9�rFOa� Phone: (209)466-3420 <br /> l Fax: (209)464-0136 <br /> j <br /> January 27, 2012 <br /> CHARLES MILLER <br /> MOLLER INVESTMENT GROUP, INC. <br /> 6591 COLLINS DRIVE, SUITE E-11 <br /> MOORPARK CA 93012 <br /> ANNE DUARTE <br /> TESORO SIERRA PROPERTIES LLC <br /> 3450 SOUTH 344TH WAY, STE 201 <br /> AUBURN WA 98001-5931 <br /> Subject: 2132 Mariposa Road SITE CODE: 1669 <br /> Stockton, CA 95206 <br /> The San Joaquin County Environmental Health Department's (END) Local Oversight <br /> Program (LOP) has received and reviewed Feasibility Study and Work Plan dated <br /> November 1, 2011, and Groundwater Monitoring Report, Fourth Quarter 2091 dated <br /> December 22, 2011, prepared by your consultant Stratus Environmental, Inc. (Stratus) <br /> and submitted on your behalf. <br /> The Quarterly Groundwater Monitoring Report, Fourth Quarter 2011 contains ground <br /> water results for sampling performed in October 2011. Ground water gasoline <br /> contaminant concentrations on-site (well S-1) continue to remain extremely elevated. <br /> Contaminant concentrations in the soil and the ground water on-site in the area of S-1 <br /> warrant remediation. <br /> The soil and ground water assessment has been completed at this site and soil and <br /> ground water cleanup will be required. The Feasibility Study and Work Plan submitted <br /> discusses three remedial technologies for soil and ground water remediation/cleanup. A <br /> limited SVE test was conducted in 1992 with favorable results. The EHD agrees with <br /> conducting a more extensive soil vapor extraction/insitu air sparge (SVE/IAS) pilot test <br /> using additional remedial wells that are designed and installed accordingly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.