Laserfiche WebLink
/ P The <br /> �rk <br /> Corporation <br /> WELL DEVELOPMENT/SAMPLING DOCUMENTATION FORM } <br /> Project Name I,_ ., ( llC� t��►..L- <br /> Job# eiM_-:325 � — <br /> Date t 24 <br /> Sampling Team <br /> (Names/Responsibilities) <br /> Purpose of Sampling Initialuarteriy Verfication Other , <br /> Weather Conditions <br /> GROUNDWATER LEVEL/CASING VOLUME <br /> Depth Total Feet of Conversion <br /> Casing Volume <br /> Time TOC to GW Depth Water Factor Gallons <br /> Initial (r(p .4(� I� l . l <br /> After develo 1 ur m p i <br /> At time of Sampling ( Three Casing Volumes Q Gals <br /> Ten Casing Volumes Gals <br /> WELL DEVELOPMENT/PURGING <br /> Equipment Swab-Aire Sub Pump Bader cipiper Other I <br /> Method Description <br /> Decontamination Method <br /> Water Containme drums baker tank other <br /> Labeled 40 <br /> Pump Vol Water TeMD fV EC Observations I <br /> Time Rate Extracted F C Ff color turbidityoils odor <br /> Start t 2� - <br /> 2 <br /> --LD•2 <br /> Lab ,�� t <br /> SAMPLE INFORMATION ' <br /> Sampling Containers/Number of Containers/Analysis Preservation Description ' <br /> —1— 1 Liter Amber <br /> Ice and <br /> 40 ml Voa .t- Ice and <br /> Other Ice and <br /> Time _ <br /> Device Disposable eso as Bailer Other , <br /> Pertinent Field Observations <br /> Deviations from Standard Sampling Protocol <br />