Laserfiche WebLink
i <br /> SITE SAFETY PLAN <br /> ' CLIENT: USA Petroleum Corporation <br /> JOB LOCATION: USA Petroleum Station #110 <br /> Stockton, California <br /> PLAN PREPARED BY: Kathleen A. Volk DATE: September 22, 1995 <br /> ' APPROVED BY: Jeffrey S. Patton DATE: September 22, 1995 <br /> OBJECTIVES: Installation of three monitoring wells. <br /> DATE(S) OF INVESTIGATION: September 25, 1995 <br /> SAFETY SUPERVISORS: Park Environmental: Jeffrey S. Patton <br />' On-Site: Chris LaRose <br />' SUBCONTRACTORS: Spectrum <br /> ONSITE HAZARDS: Underground utilities, potential soil <br /> M contaminated with petroleum hydrocarbons, <br /> electrical hazards and traffic. <br /> SPECIAL CONDITIONS: Boring on Farmington Road will require <br /> traffic signage in accordance with Caltrans <br /> regulation, due to close proximaty to roadway <br /> edge. The borings is also located close to a <br /> elementary school and will be in close <br /> proximately to children and excessive morning <br /> and afternoon traffic. Therefore, extra <br />' attention to safety procedures and practices <br /> will be required in this area. <br /> PERSONAL PROTECTIVE EQUIPMENT: Level C/D-Gloves, steel toed <br />' boots, hard hats, coveralls & <br /> respirator with organic <br /> cartridges on-site. - <br /> SURVEILLANCE EQUIPMENT: PID or Bacharach TLV Sniffer <br /> DECONTAMINATION PROCEDURE: Personal-Wash hands prior to <br /> eating, drinking, smoking & <br /> before leaving site; clean <br />' respirators & wash clothes. <br /> Equipment-Clean equipment <br /> . before leaving site. <br />