Laserfiche WebLink
' Project USA Petroleum Corporation #110 <br /> Stockton California Log of Well No MW-3-P <br /> Date Started 9/2/92 Total Depth 90 0-ft ICasing Elev 25 03 1 GW ATI)76 Oft/ <br /> ' Date Completed 913192 Perforation 0 02" slot ® from 55 to 90 <br /> Logged By Peter Frank Checked By Ed Furu Pack #3 Sand © from 52 to 90 <br /> seal Concrete . from Surface to 49 <br /> Drilling Co PlerCeSOn Driller Russ <br /> Bentonite ® from 49 to 52 <br /> Drilling Method Hollow Stem Casing Sch. 40 PVC 4" Drill Bit Diameter 10" <br /> ' Drilling Equipment B-61 Sampler Split Spoon N <br /> .-. Monrtonng @ 3 t <br /> LIthologic Description Lro,obgy weu r ° � Remarks <br /> ' W,* construction M a7 0 <br /> ow Surface Elevation N [.t <br /> ML <br /> OVA <br /> ' 5- <br /> 10— CLAYEY SILT, BROWN, MOIST,STIFF 14 0 ppm <br /> 15 - <br /> 20 - <br /> 520 CLAYEY SILT,STRONG BROWN AND GRAYISH BROWN, MOIST 0 3 ppm <br /> 25 <br /> ' 3O CLAYEY SILT WITH TRACE FINE SAND, DARK BROWN AND 0 >1000 <br /> DARK GRAYISH BROWN,MOIST, HARD <br /> 1 <br /> 35 <br /> Continued Next Page <br /> A 5100 East Hunter Avenue <br /> Anaheim, Calif omia 92807 <br /> ,P�& <br /> I Tel (714) 777-1001 Project 1125-.11 I of <br /> ' Page 1 of 3 <br /> Envuonmenta Fax (714) 777-1262 <br />