Laserfiche WebLink
FIRST QUARTER,2002 <br /> GROUNDWATER MONITORING REPORT <br /> USA STATION#110,STOCKTON <br /> APRIL 2002 <br /> 5.0 PREPARATION OF REPORT <br /> Firm Preparing Report: <br /> GHH Engineering,Inc. <br /> 11960 Heritage Oak Place #2B <br /> Auburn,California 95603 <br /> Report Prepared by: <br /> This report was prepared by GHH Engineering, Inc. Mr. Richard J. Zipp, Principal <br /> Hydrogeologist, is the qualified person responsible for overseeing this project. This report was <br /> written by Mr. James R. Peeler, Staff Geologist, and reviewed for technical content by Mr. Vern <br /> A. Bennett, Project Manager and Mr. Zipp. <br /> The analyses and conclusions submitted in this report are based upon GHH's knowledge of the <br /> site,the best available information obtained from the field investigation,persons knowledgeable <br /> about the site, and local government agencies. However,the regulatory agencies may have <br /> additional conclusions after they have reviewed and evaluated the data. This report was prepared <br /> . to assist USA in the evaluation of the site. <br /> This report has been reviewed by the client and they are responsible for the findings herein. If you <br /> have any questions or need additional information, please call the undersigned at (530) 886-3100. <br /> Thank you, <br /> �� P <br /> Vern A. Bennett James R.Peeler <br /> Project Manager 0 GE04 Staff Geologist <br /> RICHARD <br /> J. <br /> Richard J. Zipp, R.G., ZIPP <br /> Principal Hydrogeologis 0No. 3611 \p <br /> F:150071JP11n1QMR Is <br /> PC: Mr. Harlen Knoll, San Joaquin County <br /> Ms. Beth Thayer, Regional Board <br /> Mr. Srikanth Dasappa, USA Gasoline Corporation <br />