Laserfiche WebLink
. FIRST QUARTER,2000 <br /> GROUNDWATER MONITORING REPORT <br />' USA STATION 4110- STOCKTON <br /> MAY,2000 <br />' 4.0 REPORT PREPARATION <br /> Firm Preparing Report: <br /> GHH Engineering, Inc <br /> 8084 Old Auburn Road, Suite E <br />' Citrus Heights, California 95610 <br /> i <br /> Report Prepared by: <br /> This report p rt was prepared by GHH Engineering, Inc Mr Richard J Zipp, Principal Hydrogeologist, <br />' is the quahfied person responsible for overseeing this project This report was written by Ms <br /> Jennifer L Tucker, Environmental Scientist, and reviewed for technical content by Mr Vern A <br /> Bennett, Project Manager, and Mr Zipp <br />' The analysts and conclusions submitted in this report are based upon GHH's knowledge of the site, <br /> the best available information obtained from the field investigation, persons knowledgeable about <br /> the site, and local government agencies However, the regulatory agencies may have additional <br /> conclusions after they have reviewed and evaluated the data. This report was prepared to assist <br /> USA in the evaluation of the site <br /> Thus report has been reviewed by the client and they are responsible for the findings herein. IfY ou <br /> have any questions or need additional infornnation, please call the undersigned at (916) 723-7645 <br /> Thank You, <br /> REo cFo�oc <br /> 's <br /> RICHARD � <br /> J <br /> Richar J Zip , G, Hz@P <br />' Principal Hydr a logfg 3611 <br /> sT <br /> '--OF CAk-\�'Oz <br /> r Vern A Bennett <br /> ject Manager <br /> &4 cD4C4'�-' <br /> er L ucker <br /> Environme Scientist <br /> E 150071naj1QMR1 stQtr2000 wpd <br /> 4 <br />