Laserfiche WebLink
SECOND QUARTER,2002 <br /> GROUNDWATER MONITORING REPORT <br /> • USA STATION#110,STOCKTON <br /> JUNE 2002 <br /> 5.0 PREPARATION OF REPORT <br /> Firm Preparing Report: <br /> GHH Engineering,Inc <br /> 11960 Heritage Oak Place#2B <br /> Auburn, Cahforma 95603 <br /> Report Prepared by: <br /> This report was prepared by GHH Engineering,Inc Mr Richard J. Zipp, Principal <br /> Hydrogeologist, is the qualified person responsible for overseeing this project Tlus report was <br /> written by Mr James R.Peeler, Staff Geologist,and reviewed for technical content by Mr Vern <br /> A Bennett,Project Manager and Mr Zipp <br /> The analyses and conclusions submitted in this report are based upon GHH's knowledge of the <br /> site,the best available information obtained from the field investigation,persons knowledgeable <br /> about the site,and local government agencies However,the regulatory agencies may have <br /> additional conclusions after they have reviewed and evaluated the data This report was prepared <br /> • to assist USA in the evaluation of the site <br /> This report has been reviewed by the client and they are responsible for the findings herein If you <br /> have any questions or need additional information,please call the undersigned at(530) 886-3100 <br /> Thank you, <br /> 3, d, <br /> Vern A Bennett James K Peeler <br /> Project Manager vLED GE0, Staff'Geologist <br /> RICHARD <br /> d <br /> � ZIPP <br /> Richard J ,RG.,H G Na 8011 <br /> Principal HydrogeoIogsst (P <br /> F 150071vb\d\QMR s1QMR2ndQtr2002 CA► <br /> pc: Mr Harlen Knoll, San Joaquin County <br /> Ms Beth Thayer,Regional Board <br /> Mr Snkanth Dasappa,USA Gasoline Corporation <br />